SCH Number 2021060439


Project Info

Title
Goleta Energy Storage Project Draft MND
Description
The project includes a new 60 mega-watt lithium ion Energy Storage Facility. The applications associated with the proposal include a Tentative Parcel Map, Conditional Use Permit, a Development Plan, and a Development Plan Amendment Proposed Conditional Use Permit and Development Plan for the development and operation of a 60-megawatt lithium-ion battery energy facility containing energy storage cabinets (Megapacks) manufactured by Tesla along with supporting equipment such as transformers, inverters and other electrical distribution equipment. Each megapack has pre-installed energy storage components that are contained in a steel cabinet enclosure. The current design includes the installation of up to 62 Megapacks. The project also includes an on-site electrical substation with a transformer, and the construction of an underground connection (tie line) to the existing SCE Isla Vista substation located west of and adjacent to Storke Road, approximately 300 feet west of the project site.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Goleta Addendum to add battery augmentation units for Goleta Energy Storage facility. Case Nos. 24-0008-DPAM and 24-0003-CUPAM.
City of Goleta Development Plan Amendment, Conditional Use Permit Amendment, and Addendum for the Goleta Energy Storage to add battery Augmentation Units ("GES Augmentation Un
City of Goleta Goleta Energy Storage Project Draft MND