SCH Number 2019058145
Project Info
- Title
- City of Mt. Shasta Water System Improvements
- Description
- The purpose of the proposed Project is to replace aging infrastructure, achieve adequate fire flows, and ensure a safe and reliable potable water supply for customers in the City's water service area. Orem Street Area An inoperable PRV station In the N. Washington Street right~of"way (ROW) would be removed. A new ±36-square-foot PRV station would be installed in a subsurface concrete vault adjacent to North 8 Street The depth of the vault would be ±4.5 feet. The water main in North B Street would be extended to the vault using open cut trenching and would connect to pressure-reducing valves and associated plumbing within the vault. Curb, gutter, and sidewalk will be installed between the road ROW and the PRV station. *SEE NOE FOR FULL DETAILS
2 documents in project
