SCH Number 2014041050
Project Info
- Title
- Berths 121-131 Yang Ming Container Terminal Redevelopment Project
- Description
- The proposed Project would be accomplished in two phases. Phase I includes performing deepening and improvements at Berths 126-129, disposal of dredge material, expanding the West Basin Container Transfer Facility (WBICTF) by adding two loading tracks, demolishing the existing wharf and constructing a new wharf, replacing three of the eight existing 50 foot gauge container cranes with up to ten new 100-or 120 foot gauge cranes, installing associated infrastructure, and replacing and reconstructing asphalt and concrete to accommodate those changes. Phase II would demolish the existing wharf at Berths 121-126, cut back 3.7 acres of the land and create 2.1 acres of new land, construct a new, 1,400 foot long wharf, reconfigure the container yard, demolish existing buildings and construct new ones, and further expand and modernize the WBICTF.
2 documents in project