Memorandum of Understanding for Pier J Turning Basin Dredging and Peninsula Beach Sand Placement
Summary
SCH Number
2026110864
Public Agency
Port of Long Beach
Document Title
Memorandum of Understanding for Pier J Turning Basin Dredging and Peninsula Beach Sand Placement
Document Type
NOE - Notice of Exemption
Received
Posted
11/24/2026
Document Description
Memorandum of Understanding (MOU) between the City of Long Beach Public Works Department and the Port of Long Beach for emergency activities associated with dredging of beach-suitable sand from the Pier J Turning Basin for placement at Peninsula Beach to replenish lost sand associated with recent coastal storm events and minimize further erosion of sand associated with the anticipated 2026-2027 El Niño storm season.
Contact Information
Name
Mark Erickson, P.E.
Agency Name
Port of Long Beach
Job Title
Director of Program Management
Contact Types
Project Applicant
Phone
Email
Name
Allyson Teramoto
Agency Name
Port of Long Beach
Job Title
Manager
Contact Types
Lead/Public Agency
Phone
Location
Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Other Location Info
Turning basin at the head of Pier J Approach Channel, adjacent to the Pier J marine terminal in the Port of Long Beach and Peninsula Beach on the Alamitos Peninsula between the Pacific Ocean and Alamitos Bay
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
Public Resources Code Sections 21080(b)(3) and (b)(4) State CEQA Guidelines Sections 15269(a) and 15269(c)
Reasons for Exemption
Reasons why project is exempt: In accordance with the California Environmental Quality Act (CEQA), the project has been reviewed pursuant to State CEQA Guidelines Section 15002(k) – General Concepts, the three-step process for determining the appropriate environmental review documents for a project subject to CEQA and Section 15061 – Review for Exemption, the procedures for determining if a project is exempt from CEQA. Recent storm events have caused severe coastal erosion on Peninsula Beach causing an immediate threat to public safety and property requiring beach-suitable sand to be dredged from the Pier J Turning Basin for placement at Peninsula Beach to replenish lost sand and minimize further erosion of sand associated with the anticipated 2026-2027 El Niño storm season. The MOU between the City of Long Beach Public Works Department and the Port of Long Beach for activities associated with dredging of beach-suitable sand from the Pier J Turning Basin for placement at Peninsula Beach in Long Beach is an emergency project statutorily exempt from CEQA pursuant to Public Resources Code Section 21080(b)(3) and State CEQA Guidelines Section 15269(a) to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed, where a state of emergency was proclaimed by the Governor on September 21, 2026 under the California Emergency Services Act, and Public Resources Code Section 21080(b)(4) and State CEQA Guidelines Section 15269(c) for actions necessary to prevent or mitigate an emergency.
County Clerk
Los Angeles
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.