Paramount High School Senior Campus New Parking Lot

Summary

SCH Number
2026110688
Public Agency
Paramount Unified School District
Document Title
Paramount High School Senior Campus New Parking Lot
Document Type
NOE - Notice of Exemption
Received
Posted
11/20/2026
Document Description
The District is proposing the construction of a new parking lot and associated improvements on the western end of the Senior Campus (Proposed Project). The new parking lot would provide additional parking to serve the needs of the Senior Campus; specifically, the new parking lot would include 151 new parking stalls, including 6 handicapped accessible stalls, 28 electric vehicle (EV) capable stalls, and 7 EV stalls. The proposed parking lot improvements involve removal of the existing tennis courts, multi-use turf area, and storage area. Vehicular access to the new parking lot would be provided via a new access drive off of Rosecrans Avenue, which would require removal of a portion of the existing wrought-iron security fence and landscaping near the northwestern end of the campus. The new driveway would also require demolition of a portion of the public sidewalk and curb and gutter along Rosecrans Avenue. Other improvements would include new pedestrian walkways and landscape improvements. The proposed improvements to the Senior Campus would not result in any change (increase or decrease) to the existing student capacity of the Senior Campus. Construction and Phasing Construction of the Proposed Project is anticipated to occur over a period of approximately five months, commencing in mid-2027 and ending in late 2027. Construction activities would disturb approximately 2.5 acres of the 33.44-acre Project Site. No soil import or export would be required to accommodate the Proposed Project. Once construction begins, all construction equipment, activities, and workers would remain within the boundaries of the Project Site and the District’s construction contractors and activities would adhere to the City of Paramount’s construction noise regulations to avoid disruption to Senior Campus operations and surrounding residences.

Contact Information

Name
Scott Law
Agency Name
Paramount Unified School District
Job Title
Executive Director Facilities, Maintenance & Operations
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Paramount
Counties
Los Angeles
Regions
Southern California
Cross Streets
Downey Avenue and Rosecrans Avenue
Zip
90723
Total Acres
approx. 2.5 acre
State Highways
I-105, SR-19, SR-91, I-710
Railways
Union Pacific, Pacific Electric
Schools
Multiple
Waterways
LA River
Township
3S
Range
12W
Other Location Info
Schools: Paramount Park Middle School, Our Lady of the Rosary School, Paramount Adult School, Community Day School, Los Cerritos Elementary School, Alondra Middle School, Frank J. Zamboni Middle School, Harry Wirtz Elementary School, Mokler Elementary School, Emmanuel Preschool, Theodore Roosevelt Elementary School, and McKinley Elementary School
Other Information
Address: 14429 Downey Ave, Paramount, CA 90723

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
CEQA Guidelines Section 15301, 15311, and 15314
Reasons for Exemption
CEQA Guidelines Section 15301. The proposed replacement of the existing tennis courts, multi-use turf area and storage area with a new parking lot would provide additional parking to serve the needs of the Senior Campus. The new parking lot, which is considered a minor alteration of the Senior Campus, would occur within the confines of the Project Site and would not result in the expansion of the Senior Campus. Parking is an existing use and the additional spaces would serve to meet an existing need and would not constitute expansion of use. Therefore, the Proposed Project is exempt from CEQA under Section 15302. CEQA Guidelines Section 15303. The new parking lot is considered a small facility addition to the Senior Campus. As noted above, the new parking lot would provide additional parking for the Senior Campus and would occur within the confines of the Project Site. Therefore, the Proposed Project is exempt from CEQA under Section 15303. CEQA Guidelines Section 15311. The new parking lot is considered a small parking lot under Section 15311(b). As noted above, the new parking lot would provide additional needed parking accessory to the existing Senior Campus and would occur within the confines of the Project Site. Therefore, the Proposed Project is exempt from CEQA under Section 15311. CEQA Guidelines Section 15314. The new parking lot is considered a minor addition to the Senior Campus. As noted above, the new parking lot would provide additional parking to meet the existing needs of the Senior Campus and would occur within the confines of the Project Site. The Proposed Project would also not result in any change (increase or decrease) to the existing student capacity of the Senior Campus. Therefore, the Proposed Project is exempt from CEQA under Section 15314. Pursuant to CEQA Guidelines Section 15300.2, Exceptions, a categorical exemption cannot be used if the project would cause cumulative impacts, significant environmental effects, or impacts to scenic highways, hazardous waste sites, or historical resources. As detailed in the supplemental information, the Proposed Project would not result in any significant effects, would not occur near scenic highways, is not on a hazardous materials site as identified under Government Code Section 65962.5, and would not adversely impact any historical resources. The Proposed Project has been reviewed for these exception criteria and was found not to conflict with Section 15300.2. Therefore, the Proposed Project qualifies for categorical exemptions under CEQA Guidelines Sections 15301, 15303, 15311, and 15314. The District has determined that the project meets the conditions for an exemption and that no exceptions under Section 15300.2 apply.
County Clerk
Los Angeles

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.