Riverview Development Project, Soledad Canyon Pipe Relocation

Summary

SCH Number
2026110687
Public Agency
Santa Clarita Valley Water Agency
Document Title
Riverview Development Project, Soledad Canyon Pipe Relocation
Document Type
NOE - Notice of Exemption
Received
Posted
11/20/2026
Document Description
Relocation and replacement of approximately 2,700 linear feet of existing 14-inch and 8-inch asbestos cement (AC) water main with 12-inch ductile iron pipe (DIP) within Soledad Canyon Road. The water main relocation and replacement are necessary because the street improvements associated with the Riverview Development directly impact on the existing water mains located within the project corridor.

Contact Information

Name
Josephine Ngoon
Agency Name
Santa Clarita Valley Water Agency
Job Title
Senior Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Santa Clarita
Counties
Los Angeles
Regions
Southern California
Cross Streets
Soledad Canyon Road, beginning at Commuter Way and Extending Approximately 2,700 Linear Feet Wes
Zip
91350
Total Acres
35.2
Jobs
1
Parcel #
2836-011-018
State Highways
No
Railways
Metrolink
Airports
N/A
Schools
Bowman
Waterways
Santa Clara River
Township
N/A
Range
N/A
Section
N/A
Base
N/A
Other Location Info
N/A

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302
Reasons for Exemption
The project qualifies for an exemption under CEQA Guidelines Section 15302, Replacement or Reconstruction, Class 2 consists of replacement of existing utility systems where, as it the case here, the new structures will be located on the same site as the structures replaced and will have substantially the same purpose and capacity as the structure replaced and involves negligible or no expansion of use. • The project, aka the whole of the action, qualifies for an exemption under CEQA Guidelines Section 15282, Section (k), the maintenance of existing pipeline as set forth in Section 21080.21 of the Public Resources Code, as long as, which is the case here, the project does not exceed one mile in length. The total length of replacement pipeline and new pipeline for this project is approximately 2,700 LF.

Exempt Status
Other
Type, Section or Code
15282
Reasons for Exemption
The project qualifies for an exemption under CEQA Guidelines Section 15302, Replacement or Reconstruction, Class 2 consists of replacement of existing utility systems where, as it the case here, the new structures will be located on the same site as the structures replaced and will have substantially the same purpose and capacity as the structure replaced and involves negligible or no expansion of use. • The project, aka the whole of the action, qualifies for an exemption under CEQA Guidelines Section 15282, Section (k), the maintenance of existing pipeline as set forth in Section 21080.21 of the Public Resources Code, as long as, which is the case here, the project does not exceed one mile in length. The total length of replacement pipeline and new pipeline for this project is approximately 2,700 LF.
County Clerk
Los Angeles

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print