East Valley Water District Well No. 152
Summary
SCH Number
2026110197
Lead Agency
East Valley Water District
Document Title
East Valley Water District Well No. 152
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
EVWD Headquarters/Open Space (OS)/Open Space (OS) and Agricultural/Equestrian (AG/EQ)
Document Description
EVWD proposes the drilling, construction, operation, and maintenance of a new potable groundwater supply well to replace production lost due to decommissioning existing wells.
The site would include the following features: a new wellhead; an approximately 900-square-foot split-face Concrete Masonry Unit well building with a maximum height of 18 feet; an approximately 200-square-foot chemical building containing separate rooms for chlorine and orthophosphate storage tanks; a 58,000-gallon above-ground water storage tank measuring approximately 25 feet in diameter and 18 feet tall; an approximately 400-square-foot booster station equipped with two 125-horsepower electric pumps; an approximately 350-kilowatt pad-mounted standby diesel generator; and new connections to existing storm drain system and potable water pipelines. The District anticipates that the new well would be drilled to a depth of approximately 800 feet below ground surface with a maximum 42-inch-diameter casing. The well would be equipped with an electric motor and designed to produce approximately 2,000 gallons per minute of potable groundwater.
Contact Information
Name
Jason Marseilles
Agency Name
East Valley Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Name
Eliza Laws
Agency Name
Webb Associates
Job Title
Environmental Services Practice Area Leader
Contact Types
Consulting Firm
Phone
Location
Coordinates
Cities
Highland
Counties
San Bernardino
Regions
Southern California
Cross Streets
Greenspot Road
Zip
92346
Total Acres
1.13
Parcel #
029-705-124 and 029-705-123
State Highways
N/A
Railways
N/A
Airports
Redlands
Schools
Cram Elementary School
Waterways
Santa Ana River, Mill Creek, Plunge Creek
Township
1S
Range
2W
Section
7
Base
SBBM
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Coastal Conservancy (SCC), California State Lands Commission (SLC), Colorado River Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 13, State Water Resources Control Board, Division of Drinking Water, District 27, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, University of California Natural Reserve System (UCNRS)
Development Types
Other (Water Well Development, 2,000 gallons per minute)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
