Bishop Peak Riparian Restoration Project

Summary

SCH Number
2026110132
Public Agency
City of San Luis Obispo
Document Title
Bishop Peak Riparian Restoration Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/4/2026
Document Description
The proposed project consists of the implementation of two restoration projects at Bishop Peak Open Space. Together, the installation of beaver dam analogs (BDAs) and the planting of native vegetation are expected to increase water retention and water quality, improve riparian and grassland habitat, enhance resilience to future floods and fires, and sequester additional carbon. First, the proposed project will incorporate BDAs, a low-tech process-based restoration technique, which will help improve the hydrology and health of the riparian gully in the project area by halting erosion, capturing sediment, reducing water velocity, raising the water table, and creating heterogeneous wetland features for wildlife. Approximately 10 BDAs will be installed over the 5-year permit period. The BDAs will be located in the gully stream channel and along the bank using locally sourced woody material. They will be approximately 5 feet long (stream length) and up to 15 feet wide (stream width). The project also includes invasive plant removal and planting native riparian vegetation to accelerate habitat improvement. Within a riparian buffer extending 10-75 ft from the thalweg, various native trees (Sycamores, Oaks, Cottonwood), riparian shrubs (Toyon, Willows), forbs and graminoids (Deer Grass, Basket Rush) will be planted by hand in holes approximately 1-2 feet deep. To support plant establishment, an "off-grid" irrigation system will be installed. The irrigation system will distribute water from a 250-gallon cube on a mobile trailer that is regularly refilled and connected to a semi-permanent above-ground network of irrigation tubing and emitters. Additionally, native perennial grassland seeds will be hand-collected on-site and distributed throughout the floodplain. To prepare for plantings and seed scattering, manual invasive plant removal and weed-whipping will be used to suppress non-native flora. In sum, this work will create a buffer zone that provides a variety of benefits, such as accommodating floods, trapping sediment, improving water quality, and establishing wildlife habitat.

Contact Information

Name
Shawna Scott
Agency Name
City of San Luis Obispo
Job Title
Assistant Director of Utilities
Contact Types
Lead/Public Agency / Project Applicant

Name
Robert A. Hill
Agency Name
City of San Luis Obispo
Job Title
Natural Resources Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Regions
Northern California
Cross Streets
Highway 1, Stenner Creek Road
Zip
93401
Parcel #
052-601-010
State Highways
1, 101
Railways
UPRR
Schools
San Luis Coastal Unified School District
Waterways
Stenner Creek, San Luis Obispo Creek, tributaries
Other Location Info
Accessed via gate off Highway 1 across from Stenner Creek Road, located at the end of the dirt road that winds up the hill.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15333, Small Habitat Restoration Projects
Reasons for Exemption
The project consists of a small habitat restoration project not exceeding a total of 5 acres in size or 500 linear feet of in-stream habitat. The project will not have a significant adverse impact to special status species because: A. Beaver-dam analogs consisting of natural vegetative materials will be installed by hand to rehydrate and stabilize in-stream habitat damaged by recent storms. These small in-stream structures located in the wetted portion of the channel will be constructed starting at the bottom of the drainage and working up. By starting with the structure furthest downstream, each progressive installation will create an additional natural sediment filter. This will ensure that disturbed creekbed sediment mobilized during installation is mitigated by the downstream structures before exiting the project area. A potential small pulse of sediment from the construction of the bottom structure will be filtered through straw wattles before exiting the project area. To prevent harm to any nesting birds, no project activity shall occur from February 15 through August 31, unless an Avian Nesting Survey is completed prior to the start of project activity. If any nesting activity is found, permittee shall protect nests with a minimum 250-foot buffer until the young have fledged and are no longer reliant upon the nest site for survival. Additionally, during inchannel installation, a biologist and/or trained professional will be onsite to inspect the area and monitor for wildlife. The planting of native trees, shrubs, and other native vegetation will stabilize the new in-stream structures and shade the corridor. B. There are no hazardous materials at or around the project site. C. The project will not result in any significant project-specific impacts or cumulative impacts when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects because the project is limited to habitat restoration and will be implemented outside of the rainy season and using hand crews. When implemented, the project will result in beneficial effects to the riparian corridor including habitat enhancement for plants and wildlife species and erosion and sedimentation control.
County Clerk
San Luis Obispo

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.