PLER2025-00150 SMF Fuels Terminal A Fueling Station
Summary
SCH Number
2026110069
Lead Agency
Sacramento County
Document Title
PLER2025-00150 SMF Fuels Terminal A Fueling Station
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Airport/AG-80 (Agricultural 80-Acres/PQP (Cemetary, Public, Quasi-Public)
Document Description
The Sacramento International Airport (SMF) currently performs into-plane (ITP) fueling at Terminal A via refueler trucks that must cross runways and taxiways from the existing tank farm. The project proposes the construction of a refueler truck loading facility with the capacity to fuel two refueler trucks at the same time, installation of approximately 5,750 feet of 12-inch transfer main pipes, approximately 200 feet of 14-inch instrument valve system (IVS) line, and 2,300 feet of 16-inch Jet-A piping from the existing fuel tank farm. Construction of the project is anticipated to last approximately 18 months. The refueler truck loading facility will be connected to IVS via approximately 5,750 feet of 12-inch transfer main including high-point vents, low-point drains, and associated infrastructure along the transfer main routing. The truck loading facility will include construction of new pavements, two refueler truck loading positions in a concrete containment area, six refueler parking spaces, and an oil-water separator on-site in accordance with SMF and California Environmental Protection Agency (CalEPA) requirements. In addition, the site will be connected to the existing stormwater drainage system.
Contact Information
Name
Julie Newton
Agency Name
Sacramento County, Planning & Environmental Review
Job Title
Environmental Coordinator
Contact Types
Lead/Public Agency
Phone
Email
Name
Carmen Solis
Agency Name
SMF Fuels Company, LLC
Job Title
Project Manager
Contact Types
Project Applicant
Phone
Email
Location
Coordinates
Cities
Natomas Community
Counties
Sacramento
Regions
Northern California, Unincorporated
Cross Streets
Airport Boulevard and Aviation Drive
Zip
95837
Parcel #
01-0160-053, 201-0230-044, 201-0230-044
State Highways
I-5
Airports
Sacramento International Airport
Township
10N
Range
4E
Section
30
Base
MtDiablo
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water
Development Types
Other (Airport Development, Fuel Station and Pipeline)
Local Actions
Airport Development
Project Issues
Air Quality, Biological Resources, Tribal Cultural Resources
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
