Lake or Streambed Alteration Agreement No. EPIMS-SIS-68977-R1, Timber Harvesting Plan (THP) 2-26-00083-SIS “Telos.”

Summary

SCH Number
2026100859
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. EPIMS-SIS-68977-R1, Timber Harvesting Plan (THP) 2-26-00083-SIS “Telos.”
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2026
Document Description
Encroachment work includes three Class II crossings at; MP4 a skid trail crossing, MP5 a vented ford crossing, and MP9 a temporary culverted crossing. All work is described in Section II pages 53 and 54 of the Timber Harvesting Plan (THP) as approved on September 22, 2026

Contact Information

Name
Jon Woessner
Agency Name
CALFIRE
Job Title
THP Review Chair
Contact Types
Lead/Public Agency

Name
Andrew James Yarusso
Agency Name
CDFW
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Dunsmuir
Counties
Siskiyou
Regions
Northern California
Township
41N
Range
R02
Section
15
Base
MDBM
Other Location Info
The project is located in the State of California within the county of Siskiyou, northeast of the city of McCloud, Township 41 North Range 02 West Sections 15, 23, and 25 within the CALWATER State Planning Watersheds Upper Ash Creek (5505.240604) and Pilgrim Creek (5505.240601), MDBM, USGS 7.5 Quadrangles Ash Creek Butte 1986 and Elk Spring 1986

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (THP)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print