Temporary Fire Station 9, Project No. WH182A, PD265-2601

Summary

SCH Number
2026100773
Public Agency
Contra Costa County Fire Protection District (CCCFPD)
Document Title
Temporary Fire Station 9, Project No. WH182A, PD265-2601
Document Type
NOE - Notice of Exemption
Received
Posted
10/21/2026
Document Description
The Temporary Fire Station 9 (project) will be used as interim housing and maintain uninterrupted emergency response services for Fire Station 9 personnel, apparatus, and equipment during demolition and reconstruction of the existing station located at 209 Center Avenue, Pacheco, CA 94553. The project will operate 24 hours per day, seven days per week, for approximately two years during construction of the replacement Fire Station 9. The project will consist of an approximately 3,000-square-foot prefabricated stressed membrane apparatus structure; a one-story, approximately 1,500-square-foot, prefabricated modular living quarters building; a 200-square-foot Conex storage container; four parking spaces (one ADA-accessible and three staff parking spaces); and new chain-link security fencing with vehicle and personnel access gates. The prefabricated stressed membrane apparatus structure will be used for the storage and protection of two fire engines and associated emergency response equipment. The prefabricated modular living quarters will contain firefighter sleeping quarters, a kitchen, dining and dayroom space, restrooms, laundry facilities, office space, and support areas. The Conex container will serve as supplemental storage for firefighter gear, equipment, and supplies. Additional site improvements such as utility connections, lighting, and circulation areas will be added as necessary to support continuous fire station operations. Construction is anticipated to begin in March 2027 and take approximately 3 months for completion. Real property transactions, including but not limited to, leases, right-of-way acquisition and permanent and temporary easements may be needed. Utility relocations may be necessary to support this project. Utility connections to existing water, sewer, electrical, and stor.m drain lines in the project area will be required. Ground disturbance and excavations to a maximum depth of 6 feet are anticipated for utility trenching. Appropriate Best Management Practices for water pollution control will be implemented. Night or weekend work may occur. Emergency vehicles will have access at all times. Upon completion of the replacement Fire Station 9, operations would transition to the new facility.

Contact Information

Name
Sam Nichols
Agency Name
Contra Costa County Fire Protection District
Job Title
Project Applicant
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Concord
Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area
Cross Streets
Sally Ride Drive and Marsh Drive
Zip
94520
Parcel #
APN 125-010-023
State Highways
Hwy 4
Airports
Buchanan Field Airport
Other Location Info
The project is located on a paved area at Buchanan Field Airport behind the Buchanan Field Clubhouse
Other Information
200 Sally Ride Drive, Concord, CA 94520

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
(Sec. 15303[c][d][e))
Reasons for Exemption
The project is exempt under CEQA Guidelines Sections 15303[c][d][e] because: • it consists of less than four commercial buildings totaling less than 10,000 square feet that will not involve use of significant hazardous substances, is located in an urbanized area where public services and facilities are available, and is not surrounded by environmentally sensitive areas. (15303[c)) • it will include utility extensions (i.e., connections to water, sewer, electrical, and storm drain lines) that are of reasonable length and only necessary to serve the proposed structures on the site. (15303[d)) • it will include accessory structures (i.e., chain-link security fencing and Conex container). (15303[e))
County Clerk
Contra Costa

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print