Greenspot Recharge Geotechnical Investigations Project
Summary
SCH Number
2026100680
Public Agency
Big Bear Area Regional Wastewater Agency
(BBARWA)
Document Title
Greenspot Recharge Geotechnical Investigations Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/19/2026
Document Description
The Greenspot Recharge Geotechnical Investigations Project will include exploratory drilling (boring) and excavation to obtain information needed to inform the project design and determine the optimal footprint and placement for the proposed recharge basins within the site. The geotechnical investigation is expected to take one week and will begin mid-to-late October.
Contact Information
Name
Bridgette Burton
Agency Name
Big Bear Area Regional Wastewater Agency
Job Title
Assistant General Manager
Contact Types
Lead/Public Agency / Parties Undertaking Project
Phone
Email
Location
Cities
Big Bear City
Counties
San Bernardino
Regions
Southern California
Cross Streets
Hatchery Drive and Willow Lane
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
15262
Reasons for Exemption
The proposed Greenspot Recharge Geotechnical Investigations Project is statutorily exempt from substantive CEQA review as it has been determined to have no potential to cause significant adverse effects on the environment. The proposed project meets the criteria for the Feasibility and Planning Studies Statutory Exemption (identified in CEQA Section 15262), which consists of “A project involving only feasibility or planning studies for possible future actions which the agency, board, or commission has not approved, adopted, or funded does not require the preparation of an EIR or Negative Declaration but does require consideration of environmental factors. This section does not apply to the adoption of a plan that will have a legally binding effect on later activities.” The proposed project involves an investigation for planning purposes, involving a future action that has not yet been approved by the BBARWA Governing Board (the implementation of Greenspot Recharge Project). The geotechnical investigation is necessary to inform the project design, and to demonstrate performance thereof, and thus has been determined to qualify for the Feasibility and Planning Studies Statutory Exemption (identified in Section 15262). Consistent with the terms of Section 15262, environmental factors have been considered in the planning of the geotechnical investigation, including the limited, temporary nature of the field activities and the measures to be taken to avoid or minimize effects on sensitive resources. Therefore, this proposed project is not forecast to cause any potential for significant adverse environmental impacts and qualifies with the requirements for a Statutory Exemption (15262).
County Clerk
San Bernardino
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.