New Brighton Middle School Modernization and District Facilities Project

Summary

SCH Number
2026100627
Public Agency
Soquel Elementary School District
Document Title
New Brighton Middle School Modernization and District Facilities Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/19/2026
Document Description
The project scope for Phase I of the modernization at New Brighton Middle School broadly includes the following: renovation of Admin/Student Services Building E including new floor finishes, new casework, new exterior door installation, and minor power and data upgrades; flooring replacement in Room 38 of Classroom Building F; modernization of Buildings K (classrooms), L (classrooms) and M (Library), including new finishes, casework, minor door/window replacement, new exterior awnings, minor structural modifications, plumbing and mechanical upgrades, and electrical (power, data, lighting and fire alarm) upgrades; renovation of Gymnasium Building P, including restroom upgrades (including finishes and plumbing fixtures), backstop replacement (with related structural upgrades), new exterior awnings and minor power, data and lighting upgrades; and site improvements include accessibility upgrades, paving removal and replacement, minor landscaping/irrigation/storm drain and fencing scope. The project scope for Phase II of the modernization broadly includes the following: Classroom modernization of Buildings D, E and F, including new flooring, patch repair and painting of existing wall and ceiling surfaces, new casework and modifications to existing casework to remain, door/window replacement (including window curtain removal), new exterior awnings, minor structural modifications, plumbing upgrades (at classroom sink location), and electrical (power and data) upgrades and bracing of existing light fixtures. Exterior classroom scope to include removal of existing lockers and related exterior finish wall surface repair; modernization of Special Ed Admin Building H to include finish and electrical upgrades (interior doors to remain) and reconfiguration of existing restrooms into gender-neutral, ADA compliant restrooms; restroom (single occupancy and multiple- accommodation) modernization of Buildings D, E and F, including partial removal of finishes at walls, floor and ceiling to stud and related patch/repair/painting of those surfaces. Restroom scope to also include toilet partition replacement and selective plumbing fixture replacement; refinishing of existing MP wood stage flooring; site improvements include accessibility upgrades, paving removal and replacement, landscaping/irrigation/storm drain improvements (primarily in classroom courtyards), two new shade structures, renovation of covered walkway roofs including stucco soffit replacement, replacement of existing roofing (including flashing and gutters) and abandonment/removal of obsolete roof-mounted utilities and a campus-wide fire alarm upgrade. The project also includes a District Office and MOT Department facility component, which broadly includes the following: Renovations/tenant improvements to the existing District Office building including reconfiguration of interior rooms/spaces (with new interior partitions), new interior finishes, exterior wall finishes/roofing improvements, door and window replacement, new casework, new restrooms and utility improvements including power, signal/LV (including lighting and fire alarm), mechanical and plumbing upgrades. Demolition of the existing Board Room/tech offices portable building and replacement with a new pre-engineered Steel Building facility that may include a bus/maintenance shop, offices, restrooms, and storage rooms. Site improvements to include site DWK 4343130v1 paving and landscaping improvements, site security (fencing/gates) and pertinent underground utility (dry and wet) upgrades.

Contact Information

Name
Pamela l Crum
Agency Name
Soquel Union Elementary School District
Job Title
Bond & Facilities Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Name
Alison Warner
Agency Name
Soquel Union Elementary School District
Job Title
Assistant Superintendent, Business Services
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Capitola
Counties
Santa Cruz
Regions
Northern California
Cross Streets
Monterey Ave
Zip
95010
Total Acres
4.9
Jobs
3
Parcel #
036-151-01
State Highways
Highway 1
Township
011
Range
001
Section
21
Base
G215
Other Location Info
New Brighton Middle School 250 Washburn Ave Capitola, CA 95010 Soquel Union Elementary School Dist. 620 Monterey Ave Capitola, CA 95010

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15302, 15303, 15304, 15311, 15314, and 15323
Reasons for Exemption
Class 1 (Sec. 15301): The proposed Project consists of the minor alteration and modernization of existing school and District facilities on the existing campus, including interior and exterior renovations such as new finishes, casework, door/window replacement, restroom modernization and reconfiguration, and plumbing, mechanical, and electrical upgrades, and involves negligible or no expansion of existing or former use. Class 2 (Sec. 15302): The proposed Project includes the replacement or reconstruction of existing facilities on the same site, including replacement of existing roofing, backstop replacement, and renovation of covered walkway roofs. Class 3 (Sec. 15303): The proposed Project includes the construction of small new structures, including two new shade structures accessory to the existing campus. Class 4 (Sec. 15304): The proposed Project includes the minor alteration of the condition of land, including paving removal and replacement and minor landscaping, irrigation, storm drain, and fencing improvements, without the removal of healthy, mature, scenic trees. Class 11 (Sec. 15311): The proposed Project includes the construction or placement of minor structures accessory to existing facilities, including new exterior awnings and shade structures. Class 14 (Sec. 15314): The proposed Project would be located within an existing school campus, and will not increase original student capacity by more than 10 classrooms or 25 percent. Class 23 (Sec. 15323): The proposed Project consists of the normal operations of existing facilities for public gatherings for which the facilities were designed. Common Sense Exemption: It can be seen with certainty that there is no possibility that the proposed Project involves any activity that may have a significant effect on the environment.

Exempt Status
Other
Type, Section or Code
15061(b)(3)
Reasons for Exemption
Common Sense Exemption: It can be seen with certainty that there is no possibility that the proposed project involves any activity that may have a significant effect on the environment.
County Clerk
Santa Cruz

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print