Rooftop BMU Replacement by Manchester Grand Hyatt
Summary
SCH Number
2026091245
Public Agency
San Diego Unified Port District
Document Title
Rooftop BMU Replacement by Manchester Grand Hyatt
Document Type
NOE - Notice of Exemption
Received
Posted
9/29/2026
Document Description
The proposed project is a like-for-like equipment replacement of one (1) building maintenance unit (BMU) located atop the Harbor Tower at Manchester Grand Hyatt (Applicant) in the city of San Diego, California. The BMU, a permanent piece of rooftop equipment used to safely access exterior components of the building for maintenance and cleaning, has reached the end of its typical service life, has been decertified, and is now in need of replacement.
Work to specifically complete the proposed project would involve utilizing a helicopter for removal of the existing unit from the rooftop, placement of a new unit, and transfer of the decommissioned unit to an offsite location. The current BMU sits and moves on existing steel tracks which would remain in place. Utilizing hand tools, the BMU would be removed in eight (8) sections, and the new BMU equipment would be similarly installed in eight (8) sections onto the existing tracks.
A temporary ground-based equipment staging area would be established on Galleon Way, between Manchester Grand Hyatt and Marriot Marquis for the new BMU unit and expired unit after removal. Upon arrival, the helicopter would proceed along the planned flight path and hover in place above the neighboring Marriott Marquis while ground crews on the rooftop would connect the “longline” cable and rigging configuration which allows the helicopter to load and carry materials to and from the staging area and Harbor Tower.
The aircraft would lift the expired equipment vertically from its current mounting on top of the Hyatt, then place the unit down in the staging area. Once detached, the new equipment would be connected and lifted from the staging area and positioned into place by workers located atop the Hyatt. This sequence would be repeated for the planned eight (8) BMU installation sections.
The helicopter would perform all removal and replacement activities and then vacate the area; it would never land in the project area, only hover over the designated area and flight path.
Per flight regulations, the flight plan outlines a required closure radius for the project to ensure safety during operations. Temporary closures required for the proposed project would include Galleon Way, the pool decks, top two (2) floors, and rooftop of both the Hyatt and Marriott Marquis, the area surrounding Sally’s Restaurant, and portions of the southern facing Marriott Marquis outdoor space. Closure of the adjacent promenade and retail businesses would be avoided.
Construction of the proposed project is anticipated to occur in December 2026, would take approximately one (1) day to complete, and would require approximately ten (10) workers in four (4) trucks to complete the work.
Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.
Contact Information
Name
Kelly Cunningham
Agency Name
San Diego Unified Port District
Job Title
Planner I
Contact Types
Lead/Public Agency
Phone
Name
Dena Roady
Agency Name
Manchester Grand Hyatt
Job Title
General Manager
Contact Types
Project Applicant
Phone
Location
Cities
San Diego
Counties
San Diego
Regions
Southern California
Zip
92101
Other Location Info
Located atop the Harbor Tower at Manchester Grand Hyatt in the city of San Diego, California
1 Market Pl, San Diego, CA 92101
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301 (Existing Facilities) and Section 15302 (Replacement or Reconstruction)
Reasons for Exemption
The proposed project is determined to be Categorically Exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15301 (Existing Facilities) and Section 15302 (Replacement or Reconstruction) because a like-for-like replacement of a building maintenance unit would involve no expansion of use beyond that previously existing, would not result in a significant cumulative impact due to the continuation of the existing use, would consist of the replacement of an existing structure, would be located on the same site as the structure replaced, and would have the same purpose and capacity.
County Clerk
San Diego
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.