Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project

Summary

SCH Number
2026091177
Public Agency
Ventura County Watershed Protection District
Document Title
Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/28/2026
Document Description
Excessive sediments accumulated within the downstream portion of the Santa Paula Creek Flood Risk Management Facility (Facility), constructed by the U.S. Army Corps of Engineers and maintained by the Ventura County Watershed Protection District (VCWPD), due to the significant rainstorms that occurred late December 2025. The Governor of California issued a Proclamation of a State of Emergency (SOE) on December 24, 2025, and a follow-up on April 17, 2026, clarifying that “the Office of Emergency Services has validated additional damages and costs attributable to the Late December 2025 Storms, including…flooding and a heightened risk of debris flows and mudslides in Ventura County”. In addition, the National Oceanic and Atmospheric Administration issued an El Niño Advisory, clarifying on September 10, 2026, that “During the October-December 2026 season, there is a 75% chance of a historic event that would exceed the strength of previous El Niño events dating back to 1950.” In response, the Governor issued another SOE on September 21, 2026, for the 2026-2027 wet season. To address these risks, VCWPD proposes the Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project (Project), which will remove up to 70,000 cubic yards of sediment. Between the railroad and just upstream of the Santa Clara River confluence, the work would occur over up to 3,900 linear feet, weather and time permitting. An estimated maximum 12 feet of sediment depth would be removed from the channel, with the excavation depth gradually becoming shallower to daylight at the upstream end. The Project would maintain adequate capacity, prevent overtopping of the concreted rock riprap facility banks, prevent erosion of the east maintenance access road, and prevent undermining and flooding of adjacent commercial and residential properties and roads. The Project would also remove sediments accumulated within the fish ladder at the upstream end of the Facility, and would ensure suitable connection to the low flow channel immediately upstream and downstream of the fish ladder, as specified in the Facility’s Operations, Maintenance, Repair, Replacement, and Rehabilitation (OMRR&R) Manual. This work would occur over about 800 linear feet. Combined total work area within the Facility is up to 14 acres. All materials removed from the site would be transferred to the VCWPD stockpile location on uplands immediately west of the channel and south of Hwy 126. Work would include installation of temporary stream crossings utilizing six 40-ft-lengths of 3-ft-diameter pipes placed side by side to avoid operating heavy equipment in flowing water. Earthen coffer dams comprised of dry alluvium would be placed as needed to divert surface water and allow excavation of accumulated sediment under dry conditions. A team of qualified biologists would relocate aquatic organisms to suitable habitat within flowing water before, during, and immediately following each diversion. Proposed work may take about 90 working days to complete. The work area is currently largely devoid of mature vegetation due to the scouring flows received during the previous three winter storm seasons. Biological surveys would be conducted before work and each morning during work activities to identify and avoid or relocate sensitive biological resources. Work would occur outside the bird nesting season. The temporary diversion channels and final graded channel would be configured to allow successful fish passage. Boulders would be placed in the final channel with guidance from qualified biologists to provide resting areas and cover for aquatic species.

Contact Information

Name
Dominic Tyburski
Agency Name
Ventura County Watershed Protection District
Job Title
Assistant Director
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Santa Paula
Counties
Ventura
Regions
Southern California
Zip
93060
Total Acres
26
Other Location Info
Lower Santa Paula Creek In-stream from just upstream of Santa Clara River to the railroad crossing, and at the fish ladder upstream

Notice of Exemption

Exempt Status
Emergency Project
Type, Section or Code
Sec. 21080(b)(4); 15269(b)(c)
Reasons for Exemption
The Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project (Project) is statutorily exempt from the California Environmental Quality Act (CEQA) as an emergency project. (PRC 21080(b)(2); 14 CCR 15269.) Weather and time permitting, the Project involves removing up to 70,000 cubic yards of sediment from the existing Santa Paula Creek Flood Risk Management Facility (Facility) to maintain adequate capacity, prevent overtopping of the concreted rock riprap facility banks, prevent erosion of the east maintenance access road, prevent undermining and flooding of adjacent commercial and residential properties and roads, and clean out the fish ladder. Maintenance would remove sediments that accumulated during late December 2025 storms to a depth that eliminated most of the flow capacity at the downstream end of the Facility. Ventura County Watershed Protection District (VCWPD) would restore a low flow channel with shelter and cover refugia passable by fish within the Facility following sediment removal. VCWPD determined removal of sediments is necessary to ensure the Facility operates and functions properly during the upcoming 2026-2027 storm season, for which an El Niño Advisory has been issued. In addition, the National Oceanic and Atmospheric Administration clarified on September 10, 2026, that “During the October-December 2026 season, there is a 75% chance of a historic event that would exceed the strength of previous El Niño events dating back to 1950.” Governor Newsom thus issued a Proclamation of a State of Emergency (SOE) on September 21, 2026, to facilitate preparedness throughout California for the “2026-2027 wet season amid the ongoing development of a strong and likely historic El Niño event in the Pacific Ocean”. Sediment removed from the Facility would be transferred to the VCWPD stockpile location on uplands immediately west of the channel and south of Highway 126 in Santa Paula, CA. The Project is statutorily exempt from CEQA as an emergency project involving repairs to public or privately owned serviced facilities necessary to maintain service essentially to the public health, safety, and welfare. (PRC 21080(b)(2); 14 CCR 15269(b).) The Project involved a reasonable amount of planning to ensure that the Facility operates and performs as designed to provide the intended flood control protection to surrounding communities, properties, and structures during the upcoming 2026-2027 winter rainstorm season. (See 14 CCR 15269(b).) The Project is not a long-term project undertaken to prevent or mitigate a situation that has a low probability of occurring in the short term. (14 CCR 15269(c).) Given that three of the last four winters involved significant rainstorms over multiple months, the risk of similarly significant 2026-2027 winter rainstorms is not remote but highly likely in the short-term, especially given the El Niño Advisory and the impact of climate change on climatic and hydrologic conditions. In short, if the Project is not completed, the Facility will remain impacted by sediment, and it will not provide necessary flood protection services to avoid adversely affecting the public health, safety, and welfare of the surrounding communities and areas.
County Clerk
Ventura

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print