Document Description
San Bernardino County Department of Public Works proposes to rehabilitate approximately 2.9 miles of Arrow Route. Work consists of milling existing pavement to maximum depth of approximately 0.35 foot, placing new asphalt overlay, and replacing or refreshing signing and striping. Approximately 10,585 cubic yards of asphalt may be imported or exported. Construction may use a cold planer, concrete mixer, backhoe, paver, roller, and water truck and is expected to take approximately 60 days. Project will not add travel lanes or roadway capacity, affect a streambed or storm drain, relocate utilities, remove vegetation or trees, require night lighting, or require a traffic detour. As part of this Project, two (2) construction staging areas within the existing County Road right-of-way along south side of Arrow Route immediately west and east of !lex Street, were identified and evaluated. Project also includes seven (7) PEC areas affecting eight (8) privately-owned parcels along Arrow Route: APNs 023-009-104, 023-013-106, 023-013-130, 023-014-102, 023-014-103, 023-014-104, 023-014-142, and 023-016-121. PEC areas total approximately 6,050 square feet and consist of narrow strips immediately adjacent to existing curb and gutter. PECs will provide temporary construction access, expiring upon construction completion.
Contact Information
Name
Ayida Smith
Agency Name
San Bernardino County Flood Control District
Job Title
Planner III
Contact Types
Lead/Public Agency
Phone
Name
Arlene B. Chun
Agency Name
Department of Public Works, Environmental Management Division
Job Title
Engineering Manager
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fontana
Counties
San Bernardino
Regions
Southern California
Cross Streets
Arrow Route between Hickory Avenue and East Almeria Avenue
Other Location Info
Project is approximately 2.9-mile long and includes the roadway corridor, two (2) staging areas near llex Street within existing County Road right-of-way, and seven (7) Permit to Enter and Construct (PEC) areas totaling approximately 6,050 square feet on eight (8) privately-owned parcels immediately adjacent to Arrow Route.
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Existing Facilities, Section 15301(c)
Reasons for Exemption
Project qualifies under Section 15301 (c) because it involves repair and minor
alteration of an existing County street with no expansion of use or capacity. The reviewed footprint includes the
roadway, two (2) staging areas within County Road right-of-way, and seven (7) narrow PEC areas adjacent to existing
curb and gutter.
Exempt Status
Other
Type, Section or Code
Section 15061(b)(3), Common Sense Exemption
Reasons for Exemption
Section 15061 (b)(3) also applies because the limited scope and resource reviews show with certainty that there is no possibility of a significant environmental effect. The project will not add travel lanes, remove vegetation or trees, affect a streambed or storm drain, or require utility relocation.
County Clerk
San Bernardino
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.