Hopkins Street Repaving with Enhanced Safety Improvements for all Users
Summary
SCH Number
2026090306
Public Agency
City of Berkeley
Document Title
Hopkins Street Repaving with Enhanced Safety Improvements for all Users
Document Type
NOE - Notice of Exemption
Received
Posted
9/8/2026
Document Description
Per the Council approved Referral to Schedule Hopkins Street for Paving with Enhanced Safety Improvements for all Users (“Hopkins Corridor Project” or “Project”) on July 28, 2026, the approved referral is consistent with the Hopkins Corridor Project approved by City Council on May 10, 2022 for which a Notice of Exemption was filed on July 14, 2022. Consistent with the 2022 approved project, this approved referral directs staff to:
• Repave Hopkins Street from San Pablo Avenue to Sutter Street
• Include in the above repaving one-way Class IV separated bikeways on each side of the roadway from Peralta Ave/Ohlone Greenway to The Alameda
• Add one-way Class II buffered bike lanes and traffic calming on Hopkins from The Alameda to Sutter Street to the extent feasible
• Add traffic calming speed cushions and other pedestrian safety features from Stannage Ave to Peralta Ave/Ohlone Greenway to the extent feasible with other pedestrian safety features recommended by staff
• Install a raised intersection of Hopkins and Monterey Ave/California Street
• Incorporate pedestrian safety features from the 2022-2023 conceptual design as deemed appropriate by Public Works staff
• Redesign and reconstruct the existing signalized intersection (with a slip lane) of Hopkins and Sacramento Street to promote safety of all users
• Assess and implement improvements for the existing signalized intersection of Hopkins Street and The Alameda to promote safety of all users contingent upon available funding
• Install bus boarding islands/floating bus stops with the bikeway routed behind the boarding platform at AC Transit stops
• Address street and curb damage from old street trees including removal of trees that are intruding into the usable street width or impacting storm drainage and replace any removed trees at a 1:1 ratio
• Develop and implement a comprehensive Curb Management Plan for the commercial, recreational, and residential areas around Hopkins Street that includes ADA parking spaces, loading zones, short-term parking zones, waste collection service needs, and metering adjacent to commercial and/or recreational uses to encourage parking turnover and study the feasibility of expanding the Residential Preferential Parking (RPP) Eligibility Map to the Hopkins Street corridor, along with the ability of Hopkins Street residents living on or adjacent to a block with parking loss to obtain an RPP permit for the nearest street.
Hopkins Street Repaving with Enhanced Safety Improvements for all Users Notice of Exemption - September 2026 Attachment
The purpose of the project is to improve safety, mobility, and access for all users of the roadway.
Contact Information
Name
Jamie Parks
Agency Name
City of Berkeley
Job Title
Public Works Director
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Cities
Berkeley
Counties
Alameda
Regions
Citywide, Northern California
Cross Streets
Hopkins Street from San Pablo Avenue to Sutter Street
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301(c), 15302(c), 15304(h)
Reasons for Exemption
Reasons why project is exempt: Categorical Exemptions:
• 14 CCR Section 15301(c)- Class 1 Existing Facilities Categorical Exemption
Existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety); and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities and bicycle lanes, transit improvements such as bus lanes, pedestrian crossings, street trees, and other similar alterations that do not create additional automobile lanes)
o The project includes repaving (road grading) for public safety, adding bicycle
lanes, transit improvements, pedestrian crossings, street tree replacement
and no additional automobile lanes. Therefore, the project is exempt from
CEQA per 14 CCR Section 15301(c).
• 14 CCR Section 15302(c)- Class 2 Replacement or Reconstruction Categorical
Exemption
The replacement or reconstruction of existing facilities involving negligible or no expansion of capacity.
o The project includes repaving of existing roadways and other improvements
to existing facilities without expanding their capacity. Therefore, the project is
exempt from CEQA per 14 CCR Section 15302.
• 14 CCR 15304(h) - Class 4 Minor Alterations to Land Categorical Exemption
The creation of bicycle lanes on existing rights-of-way.
o The project includes creation of bicycle lanes on existing rights-of-way.
Exempt Status
Other
Type, Section or Code
15061(b)(3)
Reasons for Exemption
The activity is covered by the common sense exemption that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.
o The project includes repaving existing streets and other minor alterations to
incorporate multi-modal transportation infrastructure which together will not
have the potential to cause a significant effect on the environment.
o The project includes developing and implementing a comprehensive Curb
Management Plan for parking, loading, waste collection, etc. and studying
the feasibility of expanding the Residential Preferential Parking (RPP)
Eligibility Map. The studies and plans will not in themselves result in
reduction of parking. Further, to the extent that these plans do result in
changes to parking, reduction in the availability of parking is not an·
environmental impact under CEQA, and therefore it is clear that this project
does not have the potential to cause a significant effect on the environment.
Therefore, they are exempt from CEQA per 14 CCR Section 15061 (b)(3).
Exempt Status
Statutory Exemption
Type, Section or Code
21080.25(b)(1), 21080.25(b)(3), 21080.25(b)(9)
Reasons for Exemption
• PRC§ 21080.25(b)(1) - Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
o The project includes pedestrian and bicycle facilities that improve safety,
access, and mobility in the public right-of-way. Therefore, this project is
exempt from CEQA per PRC§ 21080.25(b)(1 ).
o Further, all the eligibility criteria of PRC§ 21080.25(c) have been met: the
project is being carried out by local agency the City of Berkeley; the City of
Berkeley took said action at a public meeting on July 28, 2026; and the
construction of the project will not require the demolition of affordable
housing units.
• PRC§ 21080.25(b)(3) - Transit prioritization projects.
o The project includes transit prioritization including bus boarding islands that
are exempt from CEQA per PRC§ 2108'0.25(b)(3).
o Further, all the eligibility criteria of PRC§ 21080.25(c) have been met: the
project is being carried out by local agency the City of Berkeley; the City of
Berkeley took said action at a public meeting on July 28, 2026; and the
construction of the project will not require the demolition of affordable
housing units.
• PRC§ 21080.25(b)(9) - A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
o The project makes repairs (repaving, sidewalk repair, and replacing street
trees that are damaging the City infrastructure) to the existing roadway, adds
pedestrian, bicycle, and transit infrastructure (including traffic calming,
raised intersections, Class II and Class IV bike lanes and transit boarding
islands), and does not add automobile capacity or new lanes to the roadway.
The entire scope of work is within the existing r,ight-of-way. The project costs
less than $50M. Therefore, the elements included in the project are exempt
from CEQA per PRC§ 21080.25(b)(9).
o Further, all the eligibility criteria of PRC§ 21080.25(c) have been met: the
project is being carried out by local agency the City of Berkeley; the City of
Berkeley took said action at a public meeting on July 28, 2026; and the
construction of the project will not require the demolition of affordable
housing units.
County Clerk
Alameda
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.