Approve Grant Agreement 126-DC26-1 with DynaChrg to Provide Funding in an Amount Not to Exceed $499,413 to Purchase and Install Five Tellus TP-EVPD-360KW DC
Summary
SCH Number
2026081097
Public Agency
Ventura County Air Pollution Control District
Document Title
Approve Grant Agreement 126-DC26-1 with DynaChrg to Provide Funding in an Amount Not to Exceed $499,413 to Purchase and Install Five Tellus TP-EVPD-360KW DC
Document Type
NOE - Notice of Exemption
Received
Posted
8/28/2026
Document Description
[PROJECT TITLE CONTINUED]: Fast chargers
The project includes installing five dual-port DC fast charging stations with an estimated total site capacity of approximately 1.25 MW, located at 11005 Citrus Drive, Ventura, CA. The charging stations will be publicly accessible 24/7 and located at an existing gas station and convenience retail site, providing key amenities for EV drivers including fuel services, restrooms, and convenience retail. The site’s location along a primary travel corridor supports both local users and corridor traffic, enabling reliable and convenient charging access. This project aims to serve as a public DC fast charging hub, which will expand access to high-power EV charging infrastructure along the SR-126 corridor.
Contact Information
Name
Holly Galbreath
Agency Name
Ventura County Air Pollution Control District
Job Title
Air Quality Specialist
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Name
Tyler Harris
Agency Name
Ventura County Air Pollution Control District
Job Title
Manager – Planning, Rules, and Incentives
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Cities
Ventura
Counties
Ventura
Regions
Southern California
Zip
93004
Other Location Info
11005 Citrus Avenue, Ventura, CA 93004
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Sections 15301 (Class 1), 15303 (Class 3), 15304 (Class 4), and 15308 (Class 8)
Reasons for Exemption
The project site is an existing parking lot and involves the installation of five dual-port DC fast charging stations. The electric vehicle charging stations will be installed on existing pavement and involve negligible or no expansion of the use of the existing parking lot. The five charging stations amount to the construction of new small structures including equipment placed on adjacent areas that require only minor alterations of the land and no removal of any healthy, mature, scenic trees. The proposed installation and operation of the electric vehicle charging stations is essential to developing essential infrastructure for the use of electric vehicles and does not have the potential of causing a significant effect on the environment.
County Clerk
Ventura
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
