Mount Tamalpais Road and Trail Management Plan Update
Summary
SCH Number
2026081012
Lead Agency
Marin Municipal Water District
Document Title
Mount Tamalpais Road and Trail Management Plan Update
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Open Space Zoning District; Public/Private Open Space Land Use Designation
Document Description
The Marin Municipal Water District (Marin Water or District) proposes to update the Road and Trail Management Plan (RTMP). The proposed RTMP Update builds upon the existing RTMP, which was approved in 2005 pursuant to its certification of the Mount Tamalpais Road and Trail Management Plan Environmental Impact Report, State Clearinghouse #2004082018 (2005 RTMP EIR).
In support of Marin Water’s mission to manage “the lands, water, and facilities in our trust to provide reliable, high-quality water and adapt and sustain these precious resources for the future,” the RTMP Update would include changes that address restoration priorities and road and trail access. The overall restoration approach would improve water quality through road-to-trail conversion projects, decommissioning and restoration of non-system routes outside of the approved trail system, and strategic rerouting of roads and trails. The RTMP Update Environmental Impact Report will include both program- and project-level analyses. The program-level component will include signage, stewardship, adaptive management for modifications to roads and trails, long-term road and trail access and restoration projects, and enforcement mechanisms. Project-level components of the RTMP Update consist of priority restoration, road and trail access modifications, and improvements intended for near-term implementation. Trail access relates to hiking, biking, and equestrian user groups. For the purposes of this plan update, bicycles include pedal-assist electric bikes (Class 1 electric bikes). The RTMP Update would continue to implement components of the 2005 RTMP unchanged, including signage and associated facilities, ongoing road and trail maintenance programs, classifications and condition of roads and trails not identified for changes as part of the RTMP Update, existing community stewardship programs, and standards for roads and trails with no change in use.
Contact Information
Name
Carly Blanchard
Agency Name
Marin Municipal Water District
Job Title
Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Name
Jessica Mitchell
Agency Name
Ascent
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm
Phone
Location
Coordinates
Cities
Unincorporated Marin County
Counties
Marin
Regions
Northern California, San Francisco Bay Area, Unincorporated
Cross Streets
Marin Municipal Water District Boundary
Total Acres
19,000
Parcel #
Marin Municipal Water District Boundary
State Highways
US 101 and SR 1
Waterways
Mount Tamalpais Watershed
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Coastal Conservancy (SCC), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Recreational (bicycle, pedestrian, and equestrian trails)
Local Actions
Road and Trail Management Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Recreation, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
