Morrison Creek and Beach Lake Levee Resiliency Projecy
2 Documents in Project
Summary
SCH Number
2026080214
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Morrison Creek and Beach Lake Levee Resiliency Projecy
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2026
Document Description
The project would raise approximately 17,550 linear feet (LF) of the existing levees, by regrading the exiting levee crowns and performing minor landside slope fills; removing and replacing approximately 1,279 LF of existing floodwalls, and constructing an additional 437 LF of new floodwalls; landside slope flattening, repair of an existing Union Pacific Railroad stoplog structure, construction of a new levee turnaround, and nature-based solutions enhancing the ecological function and long-term resilience.
Contact Information
Name
Melanie Saucier
Agency Name
SAFCA
Job Title
Executive Director
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Cross Streets
Beach Lake Levee Road and Cosumes River Boulevard
Zip
95832
Total Acres
10
Parcel #
05301800150000, 11901900150000, 11900800510000 11900900120000, 11900200570000 11900200490000, 1
State Highways
I-5, SR 160
Railways
Union Pacific Railroad
Airports
Borges-Clarksburg Airport
Schools
None.
Waterways
Upper Beach Lake, Sacramento River, Meadowlark Lake, Black Crown Lake, Stone Lake, Lower Beach L
Township
7N
Range
4E, 5E
Section
13, 24
Base
Diablo
Notice of Determination
Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
1325 J Street Suite 1700, Sacramento, CA 95816
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
