Nile Garden Elementary School Annex Project

2 Documents in Project

Summary

SCH Number
2026071195
Lead Agency
Manteca Unified School District
Document Title
Nile Garden Elementary School Annex Project
Document Type
NOD - Notice of Determination
Received
Posted
9/14/2026
Document Description
The proposed project involves the construction and operation of an annex campus to support the existing Nile Garden Elementary School located at 5700 E Nile Avenue in unincorporated San Joaquin County, California. The proposed project would consist of four primary buildings and one ancillary structure totaling approximately 56,392 square feet. Facilities would include approximately 22 classrooms, a multipurpose building designed to accommodate indoor assembly and cafeteria functions, a compact administrative building, and two learning commons. Supporting structures would include a shade structure of approximately 1,920 square feet. The proposed project would include a new internal student drop-off and pick-up area located along the northern edge of the annex buildings, along with internal drive aisles connecting to the existing campus circulation system and to Union Road. Construction of the proposed project would occur in a single phase beginning in February 2028 and would take approximately 1.5 years to complete, with construction anticipated to be completed by July 2029. Upon completion, the annex campus is expected to be fully operational and integrated with the existing school.

Contact Information

Name
Aaron Bowers
Agency Name
Manteca Unified School District
Job Title
Director II of Facilities and Operations
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Unincorporated San Joaquin County
Counties
San Joaquin
Regions
Northern California
Cross Streets
E Nile Avenue and Union Road
Zip
95337
Total Acres
8.3
Parcel #
226-070-15
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
Nile Garden Elementary School
Waterways
N/A
Township
T2S
Range
R7E
Section
19
Base
MDB&M

Notice of Determination

Approving Agency
Manteca Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
2271 W. Louise Avenue, Manteca, California 95337

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print