Washington Alt. High School Building B Mod & Two Portable Classroom Relocation

Summary

SCH Number
2026070852
Public Agency
Colton Joint Unified School District
Document Title
Washington Alt. High School Building B Mod & Two Portable Classroom Relocation
Document Type
NOE - Notice of Exemption
Received
Posted
7/21/2026
Document Description
The project involves two components that would improve facilities and programming for Washington Alternative High School to prepare the sight for the transfer of the Adult Education Program to Washington Alternative High School. The first project component proposes to relocate two (2) portable classrooms from Colton Middle School and install necessary utility infrastructure. The second component involves the proposed remodel of one classroom in Building B to become two separate administration spaces.

Contact Information

Name
Owen Chang
Agency Name
Colton Joint Unified School District
Job Title
Director of Facilities and Energy Management
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Colton
Counties
San Bernardino
Regions
Southern California
Cross Streets
Ivy Ave and E. C street
Zip
92324
Parcel #
164-151-09 and 164-151-13 and 164-151-14
Other Location Info
900 E C Street

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301 (Class 1), Section 15304 (class 4) and Section 15314 (Class 14)
Reasons for Exemption
Class 1 applies to the project as the remodel of Building B involves the minor alteration of an existing structure, involving no expansion of use beyond that of the existing. Class 4 applies to the Project as it includes only minor path of travel upgrades and trenching for utility infrastructure serving the classrooms, all work would be completed to match existing and adjacent conditions. No mature, scenic trees would be removed by the Project. Class 14 applies as the project would not increase capacity by more than 25% or 10 classrooms at the existing school. The new facility would accommodate school operations and would not increase the enrollment capacity of Washington Alternative High School. Therefore, the school enrollment capacity would remain the same as under the existing condition, and the project would not increase the original student capacity by more than 25 percent or the classroom county by 10. The project meets class 14 exemption requirements. Additionally, none of the exceptions listed in CEQA Guidelines Section 15300.2 apply to the project
County Clerk
San Bernardino

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.