Missouri Gulch Workforce Housing Project

Summary

SCH Number
2026070488
Lead Agency
Mariposa County
Document Title
Missouri Gulch Workforce Housing Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
General Plan Designation - Mariposa Town Planning Area Zoning - SFR-9K, Professional Office (PO) split for 013-030-006, DRO Design Review Overlay
Document Description
The proposed workforce housing Project would involve development of a multi-family residential complex containing up to 85 dwelling units within five three-story residential buildings, located on three parcels north of Jones Street totaling approximately 9.7 acres within the unincorporated community of Mariposa. The parcels are owned by the Yosemite Conservancy and consist of largely undeveloped land characterized by varying topography and an on-site drainage feature. The site was partially burned during the 2024 French Fire. Due to steeper terrain in the northern portion of the site, development would be concentrated in the southern approximate 4.1 acres of the property along the Jones Street frontage. The northern area would remain largely undisturbed and continue to exist in its current condition. The proposed Project would be developed in two phases. Phase 1 would consist of low-income units, and the second phase would be units priced at market value. The units would include a mix of one-, two-, and three-bedroom units. One additional building, located adjacent to Jones Street, would include limited non-residential space intended to serve residents and the surrounding community, including offices, a conference room, and an approximately 950 square-foot (SF) community room. The Project will comply with California Fire Codes as well as local fire department requirements. Specifically, the proposed buildings will be developed with 1-hour fire rated construction, utilize fire resistant finishes, and provide full National Fire Protection Association (NFPA) fire sprinkler protection. The Project site will be designed and detailed to provide sufficient defensible space around the buildings and resist wildfires. The five residential buildings would have a combined maximum building footprint of approximately 40,000 SF. The building adjacent to Jones Street will have a split use ground floor which includes a community room, offices, and several residential units. There will be two curb cuts on Jones Street, but one drive aisle will be Emergency Vehicle (EV) Access only. It will be used only for emergency vehicles or for emergency site evacuation and will serve as the primary pedestrian access route through site. The proposed Project will include internal drive aisles and parking areas providing approximately 90 parking spaces for residents and visitors. (Parking areas and drive aisles would occupy up to approximately 32,000 SF). In addition, the Project would incorporate electric vehicle charging stations, in compliance with California’s Green Building Code (CALGreen) requirements. Up to three trash enclosure structures would be located within the parking areas on site to serve the development. The proposed Project would include approximately 5,000 SF of outdoor community and recreational space, which may include landscaped open space, a garden, a playground, or similar type amenities for residents. A recreational trail segment may also be constructed through the Project site to provide sustainable mobility. In addition, the proposed Project may include the use of a car sharing service. This car sharing service would be based on the Project site and would include the use of electric vehicles that can be booked by residents or visitor, on an hourly or daily basis. This would provide users to take advantage of a convenient, inexpensive, emission-free option ridesharing program to get to their destination, whether it be a workplace, school, or other location. Bus passes may also be included as an incentive for residents. The site contains an existing drainage feature locally known as Missouri Gulch; however, the proposed Project design would intentionally avoid this feature. All development would occur outside of the topographic top-of-bank associated with the drainage channel, and no grading or construction would occur within the bed or banks of the waterway. The proposed Project would connect existing public utilities provided by Mariposa Public Utility District who serves the Mariposa Town Planning Area, including water and wastewater, and storm drainage systems maintained by Mariposa County Public Works. The proposed Project would implement an exclusive 100% all-electric design, completely omitting natural gas and propane plumbing infrastructure. To achieve this, no combustion-based heating systems will be integrated, and no gas lines or flues will be installed, ensuring a zero-emissions, modern, and energy-efficient facility. Furthermore, the proposed Project would include up to five on site underground detention basins to capture on-site storm flows. The detention basins would be designed to release stormwater runoff at existing rates to the County storm drainage system. Sustainable design features may include rooftop photovoltaic solar panels on the residential buildings, passive design to maximize solar gain and air flow, with ultimate configuration determined during final design. Construction would involve typical activities including site preparation, grading, utility installation, building construction, paving, and landscaping. In order to permit the proposed Project, Mariposa County would require a General Plan/Zoning Amendment (GP/ZA), Lot Line Adjustment (LLA), and Design Review. The GPA and ZA would pertain to the 4.1 acres proposed to be developed. The remaining 6.2 acres would remain SFR-9K and Split. The proposed GPA would change the existing land use from Single Family Residence (SFR) ½ and SFR 9K to Multi-Family Residential (MFR) to accommodate the proposed multi-family residential complex. The proposed ZA would change the existing zoning designations from SFR-9K and PO to MFR to accommodate the proposed multi-family residential complex. The LLA would be necessary to adjust the Project site to meet proposed design standards. The current Project site consists of three APNs and an LLA would result in up to three parcels. The proposed Design Review is required because the proposed Project is located within the Design Review Overlay (DRO) Zone District. The DRO is intended to protect and regulate the design of new structures and changes in the appearance of existing structures. The purpose of this district is to ensure that proposed buildings, structures, signs, and landscaping and modifications to buildings, structures, signs, and landscaping within these areas are in harmony with the surrounding areas. The intent of the zone is to enhance tourism and to stabilize and increase property values. The Area of Potential Effect (APE) and Project Site encompass approximately 4.1 acres located on the north side of Jones Street. All proposed construction activities are strictly confined within this 4.1-acre footprint. Because the final project site design was not yet established during preliminary planning in 2025, environmental compliance surveys evaluated a larger study area to ensure comprehensive coverage. Consequently, the Biological Evaluation surveyed approximately 11.6 acres, and the Phase I Cultural Resources Assessment surveyed approximately 5.88 acres.

Contact Information

Name
Will Fassett
Agency Name
Mariposa County
Job Title
Senior Community Design and Development Planner
Contact Types
Lead/Public Agency / Project Applicant

Name
Briza Grace Sholars
Agency Name
Provost & Pritchard Consulting Group
Job Title
Principal Environmental Planner, Environmental Project Manager
Contact Types
Consulting Firm

Name
David Mogavero
Agency Name
Mogavero Architects
Job Title
Principal
Contact Types
Project Applicant

Location

Cities
Unincorporated Mariposa
Counties
Mariposa
Regions
Southern California, Unincorporated
Cross Streets
north Side of Jones Street
Zip
95338
Total Acres
4.1
Parcel #
013-030-005, 013-030-014 and 013-038-004
State Highways
SR 140/49
Schools
Mariposa Elementary School
Waterways
Missouri Gulch Drainage, Mariposa Creek, Stockton Creek
Township
05S
Range
18E
Section
05S
Base
MDMB

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Pesticide Regulation (DPR), California Department of Transportation, District 10 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, Sierra Nevada Conservancy, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 11, State Water Resources Control Board, Division of Drinking Water, District 28, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Residential (Units 85, Acres 4.1)
Local Actions
General Plan Amendment, Site Plan, Rezone, Lot Line Adjustment, Design Review
Project Issues
Air Quality, Biological Resources, Cultural Resources, Transportation, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print