California State University, Bakersfield Ground Mount Solar and Battery Project
2 Documents in Project
Summary
SCH Number
2026060645
Lead Agency
California State University Board of Trustees
Document Title
California State University, Bakersfield Ground Mount Solar and Battery Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2026
Document Description
The project involves the installation of a 4.55 megawatt direct current (MWdc) ground-mounted photovoltaic (PV) solar energy system and associated electrical components on 15 acres on the main campus. A battery energy storage system (BESS) with an energy capacity of 11.7 megawatt-hours (MWh) would also be installed as part of the proposed project. The solar panel modules would be installed primarily on tracker mount systems with solar panels installed along the western portion of the project site as a south-facing fixed tilt system. Approximately 6,500 solar panels would be installed on approximately 1,275 posts.
The project would also install a lithium-ion BESS on the eastern portion of the project site. The BESS would come in a prefabricated enclosure unit and have a fire rating in compliance with industry standards. Electrical components that would be installed as part of the project include inverters, an AC combiner, transformers, and a control panel. Conduit would connect the solar energy system to the electrical components within the project site.
The proposed project would also include security features, including perimeter fencing, access gates, and lighting. The solar energy system would connect to the existing substation north of the project site, which would tie into the PG&E grid system via an underground 21-kilovolt, 825 linear foot power line.
Construction of the proposed project would occur over an eight-month period between November 2026 and December 2027. Once operational, the solar energy system would be controlled, monitored, managed, and analyzed remotely using a Supervisory Control and Data Acquisition (SCADA) system. Operation of the proposed project would be automated and unstaffed. Occasional vegetation management, periodic washing of the solar PV panels, and maintenance of the electrical components would be required to maintain safe operation and energy production.
Contact Information
Name
Kristine E. De Young
Agency Name
California State University, Bakersfield
Job Title
Associate Vice President
Contact Types
Lead/Public Agency / Parties Undertaking Project
Phone
Email
Location
Cities
Bakersfield
Counties
Kern
Regions
Citywide
Cross Streets
Kroll Way and Residence Way
Zip
93311
Total Acres
15
Parcel #
39001201
State Highways
58
Railways
BNSF
Schools
Stockdale ES, Quailwood ES, Ronald Reagan ES, CSUB
Waterways
Kern River, Arvin-Edison Canal
Township
30S
Range
27E
Section
5
Base
MDB&M
Notice of Determination
Approving Agency
The Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.