Ground Mount Solar and Battery Project

Summary

SCH Number
2026060645
Lead Agency
California State University, Bakersfield (CSUB)
Document Title
Ground Mount Solar and Battery Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The project site is designated as PS (Public/Private Schools) and zoned for R-1 (Single-Unit Dwelling) by the City of Bakersfield.
Document Description
The project involves the installation of a 4.55 megawatt direct current (MWdc) ground-mounted photovoltaic (PV) solar energy system and associated electrical components on 15 acres on the main campus. A battery energy storage system (BESS) with an energy capacity of 11.7 megawatt-hours (MWh) would also be installed as part of the proposed project. The solar panel modules installed primarily on tracker mount systems with solar panels installed along the western portion of the project site as a south-facing fixed tilt system. Approximately 6,500 solar panels would be installed on approximately 1,275 posts. The project would also install a lithium-ion BESS on the eastern portion of the project site. The BESS would come in a prefabricated enclosure unit and have a fire rating in compliance with industry standards. Electrical components that would be installed as part of the project include inverters, an AC combiner, transformers, and a control panel. Conduit would connect the solar energy system to the electrical components within the project site. The proposed project would also include security features, including perimeter fencing, access gates, and lighting. The solar energy system would connect to the existing substation north of the project site, which would tie into the PG&E grid system via an underground 21-kilovolt, 825 linear foot power line. Construction of the proposed project would occur over an eight-month period between October 2026 and December 2027. Once operational, the solar energy system would be controlled, monitored, managed, and analyzed remotely using a Supervisory Control and Data Acquisition (SCADA) system. Operation of the proposed project would be automated and unstaffed. Occasional vegetation management, periodic washing of the solar PV panels, and maintenance of the electrical components would be required to maintain safe operation and energy production.

Contact Information

Name
Aditi Arya
Agency Name
California State University, Bakersfield
Job Title
Energy and Sustainability Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Vicky Rosen
Agency Name
Michael Baker International
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm

Location

Cities
Bakersfield
Counties
Kern
Regions
Citywide
Cross Streets
Kroll Way and Residence Way
Zip
93311
Total Acres
15
Parcel #
39001201
State Highways
58
Railways
BNSF
Airports
N/A
Schools
Stockdale ES, Quailwood ES, Ronald Reagan ES, CSUB
Waterways
Kern River, Arvin-Edison Canal
Township
30S
Range
27E
Section
5
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of General Services (DGS), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, California Department of Conservation (DOC)
State Reviewing Agency Comments
California Department of Conservation (DOC)
Development Types
Power:Solar (dc(Solar))(Megawatts 4.55)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

State Comment Letters [Comments from State Reviewing Agency(ies)]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print