City of Poway Treated Water Facilities & Redundant Pipeline Project
2 Documents in Project
Summary
SCH Number
2026050413
Lead Agency
City of Poway
Document Title
City of Poway Treated Water Facilities & Redundant Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2026
Document Description
The Project proposes new water facilities to replace and abandon existing water facilities and provide treated water to the City. Specifically, the City of Poway would construct a transmission pipeline with associated vaults within Espola Road and Lake Poway Road, a new booster pump station, a forebay tank, piping between the pump station/forebay tank and existing clearwells, a sodium hypochlorite system, and a surge tank. In addition, the existing pump station approximately 700 feet east of the Espola Road intersection on the south side of Lake Poway Road would be demolished. As part of the Project, the San Diego County Water Authority would construct a new Flow Control Facility (FCF) at the Project’s connection to the Ramona Pipeline.
Contact Information
Name
Robert Weber
Agency Name
City of Poway
Job Title
Principal Civil Engineer - Utilities
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Poway
Counties
San Diego
Regions
Southern California
Cross Streets
Espola Road, Lake Poway Road
Zip
92064
Parcel #
2784377400
Schools
Poway HS, Painted Rock HS, Chaparral ES
Township
13S
Range
1W
Section
31
Other Location Info
13325 Civic Center Drive
Notice of Determination
Approving Agency
City of Poway City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://poway.org/329/Environmental-Review-Documents-Current-P
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.