Sequoia High School Facilities Master Plan
Summary
SCH Number
2026050040
Lead Agency
Sequoia Union High School District
Document Title
Sequoia High School Facilities Master Plan
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Public Facilities
Document Description
The proposed Facilities Master Plan project at Sequoia High School includes construction of a new approximately 14,000-square-foot, two-story classroom building with eight classrooms near the athletic field, student support services, restrooms, outdoor seating, and related site improvements, as well as expansion of the existing arboretum to create an outdoor classroom. The project also proposes substantial renovations and modernization of existing campus facilities, including seismic retrofitting and interior and systems upgrades to the historic Main Building, improvements to the multi-use room to enhance indoor-outdoor connectivity, modernization of the boys’ and girls’ locker rooms, and replacement of stadium lighting. Additional upgrades include improvements to Carrington Hall, the student activity building, stadium support spaces, installation of photovoltaic panels, roof resurfacing, restroom renovations, exterior repainting, artificial turf and drainage improvements at athletic fields, and lighting upgrades. The project would not increase overall student enrollment capacity. Some improvements are evaluated at a programmatic level due to limited project-specific details.
Contact Information
Name
Narayan Naidu
Agency Name
Sequoia Union High School District
Job Title
Chief Facilities Officer
Contact Types
Lead/Public Agency
Address
Phone
Email
Name
Rima Ghannam
Agency Name
Sertior
Job Title
Planner Principle
Contact Types
Consulting Firm
Phone
Email
Location
Coordinates
Cities
Redwood City
Counties
San Mateo
Regions
San Francisco Bay Area
Zip
94062
Total Acres
35
Parcel #
05-2201010
State Highways
HW 101
Railways
Caltrain
Airports
San Carlos Airport
Schools
North Start Academy; McKinley Institute of Technology
Other Location Info
1201 Brewster Avenue
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Education, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of General Services (DGS), Office of Historic Preservation, California Department of Toxic Substances Control (DTSC)
State Reviewing Agency Comments
California Department of Toxic Substances Control (DTSC)
Development Types
Educational (Campus Improvements )
Local Actions
Master Plan
Project Issues
Air Quality, Biological Resources, Cultural Resources, Geology/Soils
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
