Maple and Foothill Residential Project

Summary

SCH Number
2026041207
Lead Agency
City of Fontana
Document Title
Maple and Foothill Residential Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Vacant Land / Multi-family Medium/High Residential (24.1 – 39.0 du/ac) / Multi Family Medium/High Density Residential (24.1 – 39 du/ac)
Document Description
The proposed project involves construction and operation of a 265-unit multi-family residential development and associated parking, drive aisles, landscaping, utilities, and site amenities on approximately 8.43 gross acres (8.13 net acres). The proposed apartment complex would consist of six buildings, of which two proposed in the center of the project site would be four stories tall, while the remaining four buildings along the project site frontage of Foothill Boulevard and Maple Avenue would be three stories tall. Two community courtyards would be constructed between the four-story buildings and would include one pool and spa, lounge areas, green space, and other amenities. The project would be accessible by residents via one main driveway (full access) on Maple Avenue and a secondary, gated driveway along Foothill Boulevard for right-out maneuvers only that also would provide additional access for emergency and other service vehicles. • Master Case Number (MCN) 24-0040; • Tentative Tract Map No. (TTM) 24-0003; and • Design Review Project (DRP) 24-0015.

Contact Information

Name
Alexia Barberena
Agency Name
City of Fontana
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Name
Jake Sowder
Agency Name
Diversified Pacific
Job Title
Project Manager
Contact Types
Project Applicant

Name
Dionisios Glentis
Agency Name
LSA Associates, Inc.
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm

Location

Cities
Fontana
Counties
San Bernardino
Regions
Citywide
Cross Streets
Maple Avenue and Foothill Boulevard
Zip
92335
Total Acres
8.43
Parcel #
0243-142-01, -02, -03, -04, -05, and -06
State Highways
State Route 210
Railways
Metrolink
Airports
N/A
Schools
Maple Elementary, Palmetto Elementary, Juniper Elementary
Waterways
N/A
Township
1S
Range
5W
Section
4
Base
SBBM

Notice of Completion

Development Types
Residential (Units 265, Acres 8.43)
Local Actions
Site Plan, Land Division (Subdivision, etc.), Tentative Tract Map 20704
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments