A85 Interlocking Renewal Project
Summary
SCH Number
2026040864
Public Agency
Bay Area Rapid Transit District
(BART)
Document Title
A85 Interlocking Renewal Project
Document Type
NOE - Notice of Exemption
Received
Posted
4/17/2026
Document Description
Rail interlockings are a vital, fail-safe system in railway signaling that manage switches and signals to divert rail traffic between tracks to prevent collisions and to safely support maintenance activities. The A85 Interlocking is old and has been scheduled for replacement. It will eventually become unreliable and would result in disruption and/or delays to service. The Project would remove BART’s existing A85
Interlocking on the mainline tracks immediately northwest of Fremont BART Station and replace it with new components per current BART standards. The Project scope includes replacing components of the track structure, that is the running rails, guard rails, switch points, frogs, plates, ties, and top layer of ballast.
Contact Information
Name
Donald Dean
Agency Name
San Francisco Bay Area Rapid Transit District
Job Title
Manager of Environmental Review
Contact Types
Lead/Public Agency / Parties Undertaking Project
Phone
Email
Location
Cities
Fremont
Counties
Alameda
Regions
Citywide
Cross Streets
Mowry Avenue and Waterside Circle
Zip
94536
State Highways
SR 84, SR 238
Railways
Union Pacific Railroad
Schools
Parkman Elementary, Cal School for Deaf, Cal School for Blind
Waterways
Tule Pond
Other Location Info
Project is located on BART’s mainline tracks just northwest of the Fremont BART
Station, which is at 2000 Bart Way in Fremont. The project site is adjacent to the station’s North Parking Lot.
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Sec. 15301. Class 1, Existing Facilities
Reasons for Exemption
None of the exceptions listed in CEQA Guidelines Section 15300.2, which would prohibit the use of a categorical exemption, apply to the Project. The Project is a replacement and upgrade to existing transit facilities. The Project modifications would occur exclusively within BART right-of-way. No expansion of current space or current use is proposed. Transit service would be maintained using bus bridges.
County Clerk
Alameda
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
