FY2025-26 Road Striping Projet No. MM31002631N

Summary

SCH Number
2026040337
Public Agency
Sutter County
Document Title
FY2025-26 Road Striping Projet No. MM31002631N
Document Type
NOE - Notice of Exemption
Received
Posted
4/8/2026
Document Description
FY25-26 Road Striping Project No. MM31002631N will consist of removing the existing striping on travel lanes. The project will then lay new fog line and centerline retroreflective striping on existing paved surfaces. The striping will also include new reflectors. The work will take place within the County's right of way at the following five locations, with four possible added alternatives.

Contact Information

Name
Scott Riddle
Agency Name
Sutter County Development Services
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency

Location

Counties
Sutter
Regions
Countywide, Unincorporated
Other Location Info
5 road segments within unincorporated Sutter County with four possible added alternatives.
Other Information
The work will take place at the following; 1 Road: George Washington Blvd, Bogue Rd to SR113 2 Road: Township Rd, Clark Rd to Pennington Rd 3 Road: Broadway, N. Side of Bridge (Past Bear River Dr) to Marcum Rd 4 Road: Nuestro Rd, E. Side of HWY 99 to Natomas Rd 5 Road: Lincoln Rd, W. Side of HWY 99 to W. Side of the Bridge Add Alternates 6 Road: Moroni Rd, McGrath Rd to Tarke Rd 7 Road: McGrath Rd, Garmire Rd to Progress Rd 8 Road: Progress rd, McClatchy to Rd Acme Rd 9 Road: Reclamation Rd, Progress Rd to SRI 113

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301 [Existing Facilities]
Reasons for Exemption
15301 [Existing Facilities], Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of an existing use. The project will provide maintenance to 8 road segments within unincorporated Sutter County. All work will occur within the County's existing right-of-way and will not widen the existing asphalt of the roadway. This project results in no expansion of the existing use.
County Clerk
Sutter

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.