NOI Rework X 52

Summary

SCH Number
2026040273
Public Agency
California Department of Conservation (DOC)
Document Title
NOI Rework X 52
Document Type
NOE - Notice of Exemption
Received
Posted
4/7/2026
Document Description
Tidelands Oil Production, Co. (Tidelands) to plug an unproductive zone and add pay (recomplete) in a shallower zone in the well. The purpose of the proposed operation is to restore productive capacity. Stakeholders include Tidelands, Port of Long Beach (POLB), City of Los Angeles, and California Department of Conservation – Geologic Energy Management Division (CalGEM). The well is located on Pier A – Port of Long Beach. The rework activities will allow Tidelands to maintain production and waterflood operation of the wells. No new construction or facilities expansion will be required for the rework activities. All activities will be limited to fenced in areas protecting the existing wells that are located within concrete cellars. The well work activities timeline is approximately 10 days. The well API Number is 0403702707-02. The proposed project consists of the CalGEM approving permit # 7055580 for Tidelands Oil Production, Co. to rework the well listed below, in the Wilmington Oil Field. API # 0403702707 Well Name X 52

Contact Information

Name
Grayson Carlton
Agency Name
Department Of Conservation, Geologic Energy Management Division
Job Title
Associate Oil & Gas Engineer
Contact Types
Lead/Public Agency

Name
Pradeep Tallapalle
Agency Name
Tidelands Oil Production Co.
Job Title
agent
Contact Types
Project Applicant
Email

Location

Counties
Los Angeles
Regions
Southern California
Township
05S
Range
13W
Section
02
Base
SB

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Existing Facilities (14 CCR §§ 15301, 1684.1)
Reasons for Exemption
The project is categorically exempt from CEQA under the “Class 1” (14 CCR § 15301) exemption per the CEQA Guidelines because the proposed project is a repair or minor alteration of existing facilities and will not involve an expansion of use of the oil field, and therefore is exempt from the need for full CEQA review. Additionally, in accordance with 14 CCR § 1684.1 the Class 1 exemption consists of operation repair, maintenance, minor alternation of existing public or private structures, facilities, mechanical equipment, or topographical features involving negligible or no expansion of use beyond that existing previously. This Class includes but is not limited to conversion, and abandonment work on oil, gas, injection, and geothermal wells involving the alteration of well casing, such as perforating and casing repair, removal, or replacement; installation or removal of downhole production or injection equipment, cement plugs, bridge plugs, and packers set to isolate production or injection intervals.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2, Replacement or Reconstruction (14 CCR § 15302)
Reasons for Exemption
Class 2 applies because it consists of “replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced[.]” Examples of Class 2 include, but are not limited to, “Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity.”

Exempt Status
Categorical Exemption
Type, Section or Code
Class 7, Actions by Regulatory Agencies for Protection of Natural Resources (14 CCR § 15307)
Reasons for Exemption
The project is categorically exempt from CEQA under the “Class 7” exemption per the CEQA Guidelines because the work performed under these contracts would be the plugging and abandonment of 56 wells, restoration of 56 wells sites, the removal / remediation of tank pads, the removal of 3 pads, and the investigation and clean out of 6 unknown possible well sites.

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print