Fire Station 9 Redevelopment, Project No. WH728B
2 Documents in Project
Summary
SCH Number
2026040087
Lead Agency
Contra Costa County Fire Protection District
(CCCFPD)
Document Title
Fire Station 9 Redevelopment, Project No. WH728B
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2026
Document Description
The proposed project would demolish and reconstruct an operational fire station on the same site (0.92 acre). The existing station, which was constructed in 1956, is outdated and unable to support the staff or equipment needed for a modern fire protection agency. The new fire station building would be larger than the fire station that currently exists. The current station is a 2,215-square-foot single company, one-story station with two apparatus bays. The new structure would be an approximately 15,400-square-foot double-company, two-story station with three apparatus bays that would have a maximum height of 35 feet. The existing station has a three-person crew with one captain, one engineer, and one firefighter that works a 48-hour shift; it houses two fire engines.
The new fire station would include offices and crew quarters for up to nine firefighters during their 48-hour shifts and an apparatus bay for storing three fire engines when not on call. The office/crew quarters portion of the building would include a lobby area, a battalion chief's office, station office, nine dorm rooms, a kitchen, dining and day rooms, an exercise room, a laundry room, a communications/IT room, multipurpose room, and five restrooms. The apparatus bay would include turnout and washrooms, gear storage rooms, a restroom, storage and compressor rooms, and mechanical and electrical rooms. The project would comply with Leadership in Energy and Environmental Design (LEED) Silver standard requirements which provides a framework for healthy, efficient, and cost-effective green buildings.
The parcel would also be developed with paved areas for parking and an equipment yard for on-site vehicle cleaning and maintenance, along with two fuel tanks, an emergency generator, and a trash enclosure. In addition, landscaping and pedestrian walkways would be installed at the fire station entrance; stormwater retention basins would be installed within the landscaping throughout the parcel. Existing mature redwood trees at the corner of Center Avenue and Blackwood Drive would need to be removed from the project site. A 6-foot-tall privacy wall would be installed along Blackwood Drive, around the back of the property, and along Grayson Creek.
The project would require the following variance and exception:
• A front yard setback of approximately 4 to 10 feet is required.
Access, Circulation, and Parking
Fire engines would leave the station via Center Avenue and enter the station from Blackwood Drive. Three visitor parking spaces would be provided in the front parking lot that would be accessed from Center Avenue. Up to 16 employee parking spaces and two bike racks, for a total of four bikes, would be provided behind the building; these could be accessed from either Blackwood Drive or Center Avenue through automatic gates.
Site plans are attached.
Construction
Project construction is anticipated to begin in late 2026 and take approximately 17 months. The first phase of construction would involve demolition of the existing fire station, which would take approximately 2 months. Site preparation, including grading activities, would take approximately 1 month. Trenching and utility line preparation would then occur and take approximately 1 month to complete. Construction of the building and its interior would follow and take approximately 12 months to complete. Following building construction, site work, including paving and landscaping, would take approximately 2 months to complete. A total of 2,000 cubic yards of fill material is anticipated over the course of project construction.
Contact Information
Name
Christian Montoya
Agency Name
Contra Costa County Public Works Department
Job Title
Environmental Analyst
Contact Types
Project Applicant / Parties Undertaking Project
Phone
Name
Sam Nichols
Agency Name
Contra Costa County Fire Protection District
Job Title
Assistant Chief, Support Services
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Pacheco
Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area, Unincorporated
Cross Streets
Center Avenue and Blackwood Drive
Zip
94553
Total Acres
0.92
Parcel #
125-073-003
State Highways
I-680, SR 4, SR 242
Railways
See Other Information Tab
Airports
Buchanan Field
Schools
See Other Information Tab
Waterways
See Other Information Tab
Township
T02N
Range
R02W
Section
S27
Base
MtDiablo
Other Information
Waterways: Grayson Creek, Hidden Valley Creek, Eagle Lake Creek, Vine Hill Creek, Pacheco Creek, Walnut Creek, Pine Creek, Galindo Creek, Contra Costa Canal
Railways: Burlington Northern Santa Fe, Bay Area Rapid Transit
Schools: Morello Park Elementary School, Hidden Valley Elementary School, Meadow Homes Elementary School, Valley View Middle School, Queen of All Saints School, Mount Diablo High School, Glenbrook Middle School, College Park High School, Gregory Gardens Elementary School, Valhalla Elementary School
Notice of Determination
Approving Agency
Contra Costa County Fire Protection District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
4005 Port Chicago Highway, Suite 250, Concord, CA 94520; https://www.cccfpd.org/427/Fire-Station-9
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.