EPIMS-SHA-64872-R1_2-25-00080-SHA_Lookoout Duncan THP_NOD
Summary
SCH Number
2026040085
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
EPIMS-SHA-64872-R1_2-25-00080-SHA_Lookoout Duncan THP_NOD
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2026
Document Description
The project is limited to 6 encroachments including the use of water from two water drafting sites (D1 and D2), installation of a temporary rocked ford crossing (MP1), and the installation of 3 permanent culvert crossings (MP19, MP21, and MP22) as identified and described in the water drafting plan and the 1611 Addendum on pages 66-69 of the approved Timber Harvesting Plan (THP).
Contact Information
Name
Andrew James Yarusso
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency
Phone
Name
Jon Woessner
Agency Name
Department of Forestry and Fire Protection
Job Title
Review Team Chair
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redding
Counties
Shasta
Regions
Northern California
Township
31N
Range
09W
Section
36
Base
MDBM
Other Location Info
The project is located within the Upper Duncan Creek Planning Watershed (5524.360502), in the County of Shasta, State of California; Township 31N, Range 09W, Section 36, Township 31N, Range 08W, Section 30; Mount Diablo Base and Meridian; USGS 7.5-minute quadrangles, Bully Chop Mtn and Arbuckle, 1982.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
