Hurley 1 Unit Replacement Project

Summary

SCH Number
2026030737
Public Agency
Sacramento Municipal Utility District
Document Title
Hurley 1 Unit Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/17/2026
Document Description
The Hurley Unit 1 Replacement Project (Project) consists of replacing an aging 224-megavolt-ampere (MVA) transformer, tertiary structures, and buswork. The existing equipment associated with Unit 1 will be removed, including the surrounding grounding grid which is approximately 18-inches deep. A new 224-MVA transformer will be placed in the same location on a new concrete pad foundation. Additional related infrastructure, such as 12kV tertiary structures, bus support structures, and the drilled piers needed to support them, will also be placed within the same general area. The Project will also include modification and/or replacement of support infrastructure (i.e. switch pole, tap pole, pull box, conduit, grounding, etc.) to service the new transformer. Surface excavation will be required, reaching depths of up to 6 feet for the transformer foundation and up to 14 feet for the drilled piers supporting the tertiary and bus structures. The new substation structures will be similar in height to the existing ones. The overall footprint of the existing substation will remain the same. Construction is expected to begin in October 2027 and be completed by March 2028.

Contact Information

Name
Amy Spitzer
Agency Name
Sacramento Municipal Utility District
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Cross Streets
Ethan Way and Hurley Way
Zip
95825
Parcel #
285-0160-014

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15302
Reasons for Exemption
SMUD has reviewed and determined that the Project is categorically exempt from the provisions of CEQA pursuant to Sections 15301 (Existing Facilities) and 15302 (Replacement and Reconstruction). Section 15301 applies to projects that consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alternations of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency’s determination. Section 15302 states that "Class 2 consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced..." Thus, the Project will involve the repair and minor alternation of an existing substation facility resulting in no change or expansion of use; and the replacement of an existing transformer in the same location and serving the same purpose and capacity. Therefore, no further environmental review is required.
County Clerk
Sacramento

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.