Atmospheric River Capture Project
Summary
SCH Number
2026030496
Lead Agency
Marin Municipal Water District
Document Title
Atmospheric River Capture Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Existing roads and undevelopled land. Zoning: Planned District, Commercial/Industrial, Agricultural and Conservation (A-60), Agriculture Limited (A2-B4), Agriculture Residential Planned (ARP-60), and Open Area
Document Description
The Marin Municipal Water District (District) is proposing the Atmospheric River Capture Project (Project) to deliver water under the District’s existing agreement with the Sonoma County Water Agency (Sonoma Water) to Nicasio Reservoir for storage to improve water supply reliability under dry conditions. The Project would include construction and operation of an approximately 13.2-mile-long, 36-inch diameter water transmission pipeline within Wood Hollow Drive, Redwood Boulevard, San Marin Drive, Novato Boulevard, Point Reyes–Petaluma Road, and Nicasio Valley Road. The pipeline, referred to as the Nicasio Aqueduct, would convey water from the existing North Marin Aqueduct to Nicasio Reservoir. In addition, the Project would include two pump stations and a dechlorination facility. The Project would not increase the existing storage capacity of Nicasio Reservoir and would not modify the District’s existing agreement with Sonoma Water. The Project would deliver contract water from Sonoma Water for storage in Nicasio Reservoir during periods of high-flow events (i.e., atmospheric river events) for use by the District during dry conditions to improve water supply reliability.
Contact Information
Name
Lucy Croy
Agency Name
Marin Municipal Water District
Job Title
Water Resources Manager
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Novato
Counties
Marin
Regions
Unincorporated
Cross Streets
Wood Hollow Dr, Redwood Blvd, San Marin Dr, Novato Blvd, Pt Reyes–Petaluma Rd, Nicasio Vly Rd
Zip
94945
Parcel #
125-202-13, 125-202-14, 125-100-13 and 12 5-100-14
State Highways
101
Railways
SMART
Airports
Gnoss Field Airport
Schools
San Marin High School, San Ramon Elementary
Waterways
Nicasio Reservoir, Stafford Lake, Novato Creek, Rush Creek, Basalt Creek, Lagunitas Creek
Township
4N
Range
7W
Other Location Info
Project will occur on private property in City of Novato and unincorporated Marin County. A pipeline will be installed under Wood Hollow Drive, Redwood Boulevard, San Marin Drive, Novato Boulevard, Point Reyes–Petaluma Road, and Nicasio Valley Road.
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 25 (SWRCB), State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Water Facilities (Two pump stations and 13.2 miles of pipeline)(Type Water Storage, MGD 30)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
