Bay Avenue Lateral Replacement (“Project”)

Summary

SCH Number
2026030267
Public Agency
Edgemont Community Services District
Document Title
Bay Avenue Lateral Replacement (“Project”)
Document Type
NOE - Notice of Exemption
Received
Posted
3/6/2026
Document Description
The Project is located within ECSD’s service area in the City of Moreno Valley, Riverside County, California. The Project is located on Bay Avenue, between Day Street and Grant Street for a total construction impact area of approximately 0.052-acre (2,280 square feet) that includes a trenching length of 570 linear feet. The purpose of the Project is to implement a replacement project identified in the ECSD Capital Improvement Program. Specifically, the Project will replace 15 existing sewer laterals that are currently 4-inch diameter verified clay pipe (VCP) with new 4-inch polyvinyl chloride pipe (PVC) for a total length of 420 linear feet and replace two 30-foot long segments of existing sewer main pipeline (8-inch PVC) for a total length of approximately 60 linear feet. The Project will also add a maximum of 25 sewer cleanouts to existing sewer laterals in order to offer a direct entry point for maintenance.

Contact Information

Name
Jessica Palmer
Agency Name
Edgemont Community Services District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Moreno Valley
Counties
Riverside
Regions
Citywide
Cross Streets
Bay Avenue, between Day Street and Grant Street
Zip
92553
Total Acres
0.052
Township
3S
Range
4W
Section
11

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2 – Replacement or Reconstruction (§15302)
Reasons for Exemption
The Project is categorically exempt from CEQA under Class 2 (Replacement or Reconstruction) exemptions set forth in State CEQA Guidelines Sections 15302. The Class 2 exemption applies to the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The Project is the replacement of two 30-foot sewer main pipeline segments, adding up to 25 sewer cleanouts and replacing 15 laterals within one street in ECSD's service area. All construction activities will occur within existing public rights-of-way, utility easements, and previously disturbed areas. No expansion of the ECSD’s service area, capacity, new alignment, or new service connections beyond those existing will occur.
County Clerk
Riverside

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print