Agoura Business Center North

Summary

SCH Number
2026020744
Lead Agency
City of Agoura Hills
Document Title
Agoura Business Center North
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
General Plan: BP-M (Business Park - Manufacturing) Zoning: BP-M-FC (Business Park - Manufacturing and Freeway Corridor Overlay District)
Document Description
Pursuant to State CEQA Guidelines Section 15070, the City of Agoura Hills, as the lead agency under CEQA, prepared an IS/MND to evaluate the potential environmental impacts associated with the Agoura Business Center North Project in 2008. The 2008 MND was prepared to assess the potential environmental impacts associated with the development of seven single-story industrial buildings. The City certified the Final MND in June of 2008. Specifically, the proposed development identified under the Final MND in 2008 consisted of two buildings placed adjacent to Canwood Street and five additional buildings in the rear of the parcel behind a knoll. After the construction of the front two buildings, the applicant placed the construction of the additional five buildings on hold. The proposed development now proposes site modifications in the form of two larger industrial buildings instead of five smaller buildings in the rear. The project now proposes construction of Building C totaling 35,532 square-feet and Building D totaling 36,545 square-feet. The proposed new buildings would have the same architectural style and would use the same colors as the existing two buildings. Overall, the project site is designated BP-M (Business Park – Manufacturing) in the City’s General Plan and BP-M-FC (Business Park – Manufacturing within the Freeway Corridor Overlay) in the zoning ordinance. The proposed project does not include changes to either designation and is consistent with the City’s General Plan.

Contact Information

Name
Eric Wang
Agency Name
City of Agoura Hills
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Name
Ryan Luckert
Agency Name
Rincon Consultants, Inc.
Job Title
Senior Planner
Contact Types
Consulting Firm

Name
Agoura Business Center North
Agency Name
Dale Poe Real Estate Group
Job Title
Property Owner
Contact Types
Project Applicant

Location

Cities
Agoura Hills
Counties
Los Angeles
Regions
Citywide
Cross Streets
North of Canwood Street between Clareton Drive and Derry Avenue intersections
Zip
91301
Total Acres
7.7
Jobs
59
Parcel #
2048-012-035
State Highways
US-101 Ventura Freeway
Schools
See "Other Location Info"
Waterways
Medea Creek, Lindero Creek, and multiple un-named streams
Other Location Info
Schools: Agoura High, Lindero Canyon Middle School, Sucmac Elementary School, Brookside Elementary School, Willow Elementary School, Mountainview Montessori, Montessori School of Agoura

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California Santa Monica Mountains Conservancy (SMMC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights
Development Types
Industrial (Light Industrial Condominiums (21 units))(Sq. Ft. 72077, Acres 1.65, Employees 59)
Local Actions
Site Plan, Use Permit
Project Issues
Biological Resources, Cultural Resources, Geology/Soils, Transportation, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print