Repair Erosion at WRPP Spoil Pile
Summary
SCH Number
2026010382
Public Agency
California Department of Water Resources
(DWR)
Document Title
Repair Erosion at WRPP Spoil Pile
Document Type
NOE - Notice of Exemption
Received
Posted
1/14/2026
Document Description
San Joaquin Field Division plans to fill an erosion west of the Wheeler Ridge Pumping Plant spoils pile site. The erosion is around 115 feet long and 25 feet at its widest. To complete this work, rocks and fill material will be dumped into the erosion using a dump truck and/or loader. A skid steer and backhoe would be used to compact the soil. A water truck may be used to control dust and aid in compaction. This work is expected to take 2 weeks to complete, and all work will be completed within the DWR right of way. This work is necessary to prevent further damage to the side of the spoils pile site.
Contact Information
Name
Elizabeth Maldonado
Agency Name
Department of Water Resources, San Joaquin Field Division
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Lead/Public Agency
Phone
Location
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301 (b)
Reasons for Exemption
This project consists of maintenance activities that support the function of the California Aqueduct and water delivery within the State Water Project.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.