Garrapata State Park Rocky Ridge Trail Project

2 Documents in Project

Summary

SCH Number
2026010310
Lead Agency
California Department of Parks and Recreation
Document Title
Garrapata State Park Rocky Ridge Trail Project
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2026
Document Description
The Garrapata State Park Rocky Ridge Trail (Project) is a proposed Class 2 pedestrian trail totaling approximately 5 miles of new, re-routed trail and 3 miles of decommissioned trail. The re-aligned trail will be longer than the existing trail since it will be constructed at a lesser grade but still maintain access to the top of Rocky Ridge and connect with the Soberanes Canyon Trail like the existing trail does.

Contact Information

Name
Jim Doran
Agency Name
California State Parks
Job Title
Monterey District Maintenance Chief
Contact Types
Lead/Public Agency

Location

Counties
Monterey
Regions
Countywide
Cross Streets
Along Highway 1
Zip
93923
Total Acres
4.25
State Highways
Highway 1
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
seasonal wetlands
Other Location Info
The 30.71-acre Project Site is located within Garrapata SP, Monterey County, and is located approximately 4 driving miles south of the City of Carmel-By-The-Sea on Highway 1. Most of Garrapata SP is situated on the east side of Highway 1, rising steeply from the coastal bluffs and featuring trails through scrub and grassland covered hillsides and redwood-filled canyons. Parking for the SP is limited to the shoulders along Highway 1 with a small turnout on the east side that can accommodate approximately 10-15 cars. Trail access on the east side of the park includes the Rocky Ridge Trail and Soberanes Canyon Trail which connect near the east end of Soberanes Canyon and create a loop trail totaling approximately 4.25 miles.

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print