Durham Pentz Intersection

3 Documents in Project

Summary

SCH Number
2026010061
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Durham Pentz Intersection
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2026
Document Description
Improve the Durham Pentz Road Intersection on SR 191 in Butte County between PM 3.28 and 3.78 south of Paradise. Specifically, replace existing temporary roundabout with a permanent roundabout with a larger inscribed circle diameter, raised splitter islands, raised truck apron, chicanes, lighting improvements, modified flashing beacons, upgraded count station, upgraded signs, striping, drainage, and construction of Maintenance Vehicle Pullouts at PM 3.39 and 3.68.

Contact Information

Name
Caitlin Greenwood
Agency Name
California Department of Transportation District 3
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Location

Counties
Butte
Regions
Northern California
Cross Streets
Durham Pentz Road intersection on SR 191
State Highways
State Route 191
Other Location Info
State Route (SR) 191 from Post Mile (PM) 3.28 to 3.78 in Butte County

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
Caltrans District 3, 703 B Street, Marysville, CA 95901.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print