Santa Ana Rezone Project
3 Documents in Project
Summary
SCH Number
2025121015
Lead Agency
City of Santa Ana
Document Title
Santa Ana Rezone Project
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2026
Document Description
The City would improve an existing unpaved overflow parking lot serving the Santa Ana Zoo with paving, marked parking spaces, and circulation lanes to enhance appearance and operational efficiency. The access road would be demolished and reconstructed as part of the parking lot improvements. The parking lot would include 250 parking stalls, including 200 standard stalls, 40 standard electric vehicle (EV) stalls, and 10 EV accessible stalls. All stalls would be accessible to zoo patrons when overflow parking is required. A solar panel shade structure would also be constructed above the EV parking stalls. A General Plan amendment from Open Space (OS) to General Commercial (GC), and a rezone from General Agriculture (A-1) to General Commercial (C-2) would be required.
Contact Information
Name
Cesar Barrera
Agency Name
City of Santa Ana
Job Title
Acting City Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Santa Ana
Counties
Orange
Regions
Citywide
Cross Streets
East Chestnut Avenue and Zoo Lane
Zip
92701
Total Acres
3.48
Notice of Determination
Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://www.santa-ana.org/notice-of-intent-to-adopt-a-mitigated-negative-declaration-for-a-rezone-project-in-the-city-of-santa-ana/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
