Paregien Basin

2 Documents in Project

Summary

SCH Number
2025120957
Lead Agency
Exeter Irrigation District
Document Title
Paregien Basin
Document Type
NOD - Notice of Determination
Received
Posted
2/18/2026
Document Description
The District plans to develop an approximately 50-acre recharge facility known as the Paregien Basin located directly south of Highway 198, northeast of the City of Farmersville. The new groundwater recharge basin would include a new turnout connection from Deep Creek. The Project would also include approximately 350 feet of pipeline connecting the new turnout to the proposed basin. The pipeline connection from the proposed recharge basin to Deep Creek will be located on the south side of the existing West Pond, which is not a part of the Project. The area to the north and east of the existing pond will be avoided as it has been identi?ed as a potentially sensitive habitat area. No Project activities will occur in this area. The proposed turnout would be developed with a capacity for approximately 20 cubic feet per second (CFS). The proposed turnout facility would consist of cast-in-place concrete structure, control gate(s), trash rack, and related appurtenances from the west bank of Deep Creek to divert to the proposed basin. The turnout structure would connect to an inlet pipeline approximately 350 linear feet (LF) from Deep Creek into the proposed Paregien Basin. The turnout structure would have a maximum excavation depth of 15 feet below ground surface for establishing proper compaction under the structure and pipeline. All excavation material would be balanced on site. Construction would include equipment mobilization, excavation of earthwork for the recharge basin and construction of basin perimeter berms. The Project site would contain temporary staging areas for construction equipment and material storage during the construction effort. Basin construction would include performance testing (i.e. compaction testing) and demobilization. Excavation material would be used on site for berm construction along the perimeter of the basin. New berm construction would not exceed six feet in height, measured from the exterior toe to the top of new berm. The maximum depth of ground disturbance for the basin would be as much as nine (9) feet. Through the improvements of this proposed multi-cell recharge basin, it is anticipated to recharge approximately 1,260 acre-feet (AF) on an average annual basis. However, the site is capable of recharging more in wet years when surplus water is available for longer durations. The 1,260 AF estimate is derived based on an estimated recharge rate of 0.5 AF per acre across the approximately 50 acres of wetted area for an estimated duration of 50 days, which is an approximate average of historical water availability on the Kaweah system. Typical surplus surface water availability is generally between March and June. However, in very wet years, water could be diverted for recharge whenever excess supply is available, which could occur from January to September or October.

Contact Information

Name
Gene Kilgore
Agency Name
Exeter Irrigation District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Farmersville
Counties
Tulare
Regions
Southern California
Total Acres
50
Parcel #
111-025-010 and -025
State Highways
Hwy 198
Waterways
Deep Creek

Notice of Determination

Approving Agency
Exeter Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
Exeter Irrigation District - 150 S. E Street, Exeter, CA 93221

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.