Zero Emissions Port Electrification of Operations and Grid Reliability Project
2 Documents in Project
Summary
SCH Number
2025120795
Lead Agency
Los Angeles Department of Water and Power
Document Title
Zero Emissions Port Electrification of Operations and Grid Reliability Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2026
Document Description
The Los Angeles Department of Water and Power (LADWP) proposes to increase the capacity of electricity distribution within the POLA by installing sixteen (16) new 34.5 kilovolt (kV) underground distribution circuits. To accommodate the estimated increase in load, LADWP is proposing to expand the capacity of RS-Q and RS-C, install three new switching stations, and construct a wet cooling tower within HGS to maintain existing generation capacity to ensure the reliability and resilience of the City grid.
Contact Information
Name
Marshall Cyr
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Cities
Los Angeles
Counties
Los Angeles
Regions
Citywide
Cross Streets
Harry Bridges and Fries Avenue
Zip
90744
State Highways
110, 1, 47
Railways
Union Pacific
Schools
George De La Torre Junior Elementary School
Waterways
Pacific Ocean
Township
T05S
Range
R13W
Section
4-9,16
Other Location Info
See MND for complete Project location information.
Notice of Determination
Approving Agency
Los Angeles Department of Water and Power
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Los Angeles Department of Water and Power, 111 N Hope Street, Rm 1044, Los Angeles, CA 90012
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
