Interstate 40 Minor Pavement Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2025120518
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
Interstate 40 Minor Pavement Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2026
Document Description
Caltrans proposes to install 0.15-ft thick Rubberized Hot Mix Asphalt-Gap (RHMA-G) overlay on the Interstate 40 mainline and shoulders; construct 0.4-ft thick localized digouts (10%of total Asphalt Concrete[AC]); replace AC dikes; upgrade existing metal beam guardrail to Midwest Guardrail System (MGS); replace rock slope protection (RSP) under two bridges at Gas Line Wash (Bridge No. 54-0715 L/R) due to inadequate rock type and size; replace traffic sign panels with type XI retro-reflective sheeting to meet federal requirements, and replace four culverts in poor or fair condition under Drainage Restoration program in order to protect the embankment and roadway from potential failure. The pavement grinding would include the removal of thermoplastic traffic stripes. Lane closure would be required to minimize traffic impact during construction and to ensure the safety of the traveling public and construction workers. Construction is expected in the night time and 8 hours a night. The new MGS at the bridge locations will be connected to a new concrete barrier transition at the beginning and the end of each bridge railing. The concrete barrier transition will be attached through drilling and bonding into existing bridge railing. Asbestos testing may be required for the existing bridge railing. No other bridge work is planned. Below is the list of all bridges that require concrete barrier transition: Gas Line Wash (Bridge No. 54-0715 R/L; Twin Hills Wash (Bridge No. 54-0716 R/L; Crest Wash (Bridge No. 54-0717 R/L); National Trails Highway Undercrossing (Bridge No 54-0708 R/L); Newberry Road Overcrossing (Bridge No. 54-0709); Fort Cady Road Overcrossing (Bridge No. 54-0710). All work is expected to be performed within the existing Caltrans right of way.

Contact Information

Name
Kourtney Graves
Agency Name
California Department of Transportation
Job Title
Acting Senior Env Planner
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Regions
Countywide
Cross Streets
National Trails Highway/Interstate 40
Zip
92365
State Highways
SR-66
Railways
BNSF Railway
Airports
Barstow-Daggett Airport
Waterways
Gas Line Wash Channel

Notice of Determination

Approving Agency
California Department of Transportation, District 8
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print