Vista Continuation High School Modernization

2 Documents in Project

Summary

SCH Number
2025120371
Lead Agency
Kern Union High School District
Document Title
Vista Continuation High School Modernization
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2026
Document Description
Kern High School District (District) is proposing to update the existing Vista Continuation High School (VCHS) campus to enhance the learning experience and offer new and modern amenities for the student population and faculty, as well as improve the overall use of the existing property. The Project proposes to demolish the existing buildings, internal access roads, parking spaces and courtyard to construct new buildings, outdoor recreational spaces and relocate existing ballfields on the existing 15.5-acre Project site in Bakersfield, California. All proposed construction will occur on previously disturbed ground and developed campus grounds and primary access will remain on P Street The student enrollment at VCHS was 210 students in 2024. While the Project will increase the student population to approximately 440 students and up to 5 additional staff, the increase in the student and faculty population will occur over time and not immediately after construction is complete. Based on the current student population, it is anticipated that approximately 53 percent of students will be bused to the school while the remaining 47 percent will be driven and dropped off, will drive their own vehicles or will walk to school each day. The District is proposing the construction of four conventionally framed buildings for the following uses: 1) a gymnasium, 2) a multi-purpose and cafeteria building, 3) an administration building and 4) a two-story classroom building with library. Additionally, the Project will include a pre-fabricated field house/concessions building of approximately 1,334 square feet. The total combined building square footage is approximately 50,000 square feet. The Project also proposes a central outdoor courtyard, two outdoor basketball courts, adequate parking for staff, visitors, and students, drop off lanes, access and fire lanes, outdoor lighting and the relocation of three existing ballfields. The high school will incorporate the use of renewable solar energy generated by rooftop solar and/or solar panel covered parking to offset the school’s current energy demand. Project Timeline Construction of the Project would occur over a maximum of 12 to 18 months. It is anticipated that the following pieces of equipment would be used during construction activities: • Roller • Loaded trucks • Excavator • Generator • Service truck • Air compressor

Contact Information

Name
Jaymie Brauer
Agency Name
Kern High School District, Facilities Planning
Job Title
Principal Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Bakersfield
Counties
Kern
Regions
Citywide
Cross Streets
P Street, Brundage Lane, 4th Street
Zip
93307
Total Acres
15.5
Parcel #
010-110-03
State Highways
58, 204, 99, 178
Railways
San Joaquin Valley Railroad
Airports
Bakersfield Municipal
Schools
Vista Cont. HS, Emerson MS, McKinley ES
Waterways
Kern Island Canal
Township
29S
Range
28E
Section
31
Base
MDB&M

Notice of Determination

Approving Agency
Kern Union High School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
801 South Mt. Vernon Avenue, Bakersfield CA 93307

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.