Vista Continuation High School Modernization
Summary
SCH Number
2025120371
Lead Agency
Kern Union High School District
Document Title
Vista Continuation High School Modernization
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Existing High School/R-3 Medium Density Multi-Unit Dwelling/Park and Recreation (OS-P)
Document Description
Kern High School District (District) is proposing to update the existing Vista Continuation High School (VCHS) campus to enhance the learning experience and offer new and modern amenities for the student population and faculty, as well as improve the overall use of the existing property. The Project proposes to demolish the existing buildings, internal access roads, parking spaces and courtyard to construct new buildings, outdoor recreational spaces and relocate existing ballfields on the existing 15.5-acre Project site in Bakersfield, California. All proposed construction will occur on previously disturbed ground and developed campus grounds and primary access will remain on P Street
The student enrollment at VCHS was 210 students in 2024. While the Project will increase the student population to approximately 440 students and up to 5 additional staff, the increase in the student and faculty population will occur over time and not immediately after construction is complete. Based on the current student population, it is anticipated that approximately 53 percent of students will be bused to the school while the remaining 47 percent will be driven and dropped off, will drive their own vehicles or will walk to school each day.
The District is proposing the construction of four conventionally framed buildings for the following uses: 1) a gymnasium, 2) a multi-purpose and cafeteria building, 3) an administration building and 4) a two-story classroom building with library. Additionally, the Project will include a pre-fabricated field house/concessions building of approximately 1,334 square feet. The total combined building square footage is approximately 50,000 square feet. The Project also proposes a central outdoor courtyard, two outdoor basketball courts, adequate parking for staff, visitors, and students, drop off lanes, access and fire lanes, outdoor lighting and the relocation of three existing ballfields. The high school will incorporate the use of renewable solar energy generated by rooftop solar and/or solar panel covered parking to offset the school’s current energy demand.
Project Timeline
Construction of the Project would occur over a maximum of 12 to 18 months. It is
anticipated that the following pieces of equipment would be used during construction
activities:
• Roller
• Loaded trucks
• Excavator
• Generator
• Service truck
• Air compressor
Contact Information
Name
Jaymie Brauer
Agency Name
Kern Union High School District
Job Title
Principal Planner Consultant
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Bakersfield
Counties
Kern
Regions
Citywide
Cross Streets
P Street, Brundage Lane, 4th Street
Zip
93307
Total Acres
15.50
Parcel #
010-110-03
State Highways
58, 204, 99, 178
Railways
San Joaquin Valley Railroad
Airports
Bakersfield Municipal
Schools
Vista Cont. HS, Emerson MS, McKinley ES
Waterways
Kern Island Canal
Township
29S
Range
28E
Section
31
Base
MDB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of General Services (DGS), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Toxic Substances Control (DTSC)
State Reviewing Agency Comments
California Department of Toxic Substances Control (DTSC)
Development Types
Educational (50 ,000 square feet)
Local Actions
Funding
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
