San Antonio Well Above Ground Facilities

Summary

SCH Number
2025120096
Public Agency
Goleta Water District
Document Title
San Antonio Well Above Ground Facilities
Document Type
NOE - Notice of Exemption
Received
Posted
12/3/2025
Document Description
The project consists of rehabilitating and upgrading the San Antonio Well facility to maintain production and treatment capacity. Improvements include replacing the backwash tank, upgrading the filtration system, upsizing chemical storage, replacing the lift station, and repairing electrical, structural, and drainage systems. San Antonio Well, one of the District’s highest-producing wells, currently produces up to 730 gallons per minute. These upgrades will improve operational reliability, sustain maximum treatment capacity, and ensure continued water supply during droughts or water quality fluctuations.

Contact Information

Name
Daniel Brooks
Agency Name
Goleta Water District
Job Title
Engineering and Infrastructure Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Counties
Santa Barbara
Regions
Citywide

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15302– Replacement of Existing Utility System
Reasons for Exemption
This project is categorically exempt under CEQA Guidelines Section 15302. The lift station, backwash tank, and electrical systems are being replaced with no expansion of capacity. All work occurs on a developed District site and will not affect environmentally sensitive areas.
County Clerk
Santa Barbara

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print