Dana Ranch Timber Harvesting Plan #2-25-00139-NEV (Streambed Alteration Agreement EPIMS Notification No. NEV-63191-R2)

Summary

SCH Number
2025111106
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Dana Ranch Timber Harvesting Plan #2-25-00139-NEV (Streambed Alteration Agreement EPIMS Notification No. NEV-63191-R2)
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number NEV-63191-R2, pursuant to section 1611 of the Fish and Game Code to the project Applicant, Terry Rogers. The project is limited to the installation of one temporary “Humboldt” log crossing over an unnamed tributary to North Fork Deer Creek, to be removed upon completion of operations in the same year it is installed.

Contact Information

Name
Rose Sanchez
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Redding Review Team
Agency Name
Department of Forestry and Fire Protection
Job Title
Review Team Chair
Contact Types
Lead/Public Agency

Location

Counties
Nevada
Regions
Northern California
Other Location Info
The project is located within the boundaries of a timber harvesting plan in Nevada County, within CALWATER watersheds Burlington Ridge, Roscoe Creek, and their connecting tributaries; Section 21, Township 17N, Range 10E, U.S. Geological Survey (USGS) map Washington; Mount Diablo Base and Meridian; Assessor’s Parcel Number 014-251-001, 014-251-002, and 014-251-005.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print