Document Description
The City of Beaumont (City), in coordination with the California Department of Transportation (Caltrans), is proposing a grade separation at the existing Pennsylvania Avenue/Union Pacific Railroad (UPRR) at-grade crossing through the construction of an underpass (i.e., roadway would be depressed under the existing rail line) (Project). The roadway improvements would extend along Pennsylvania Avenue from 3rd Street to the south, to just north of the I-10 off-ramp to the north. Following construction, the horizontal alignment for the rail line would remain in its current location, while the vertical alignment/elevation would involve slight adjustment (elevation would vary from zero to two feet compared to the existing elevation). The width of the new bridge would be approximately 105 feet.
The existing roadway condition on Pennsylvania Avenue consists of two through lanes in each direction (northbound [NB] and southbound [SB]), a center median, and a dedicated left-turn pocket from SB Pennsylvania Avenue to the eastbound (EB) Interstate (I-) 10 on-ramp, In addition, a sidewalk is present along the SB side of Pennsylvania Avenue that extends from East 1st Street to the south to East 6th Street to the north.
Consistent with the existing roadway cross-section, following construction of the Project Pennsylvania Avenue would consist of two through lanes in each direction (NB and SB), a center median, a dedicated left-turn pocket from SB Pennsylvania Avenue to the EB I-10 on-ramp, and a sidewalk in the SB direction. In addition, the following improvements would be included:
• Sidewalk along the NB side of Pennsylvania Avenue
• Reprofiling of existing I-10 EB on-ramp and westbound (WB) off-ramp for a distance of approximately 300 feet and 800 feet, respectively, to match the lowered elevation of Pennsylvania Avenue
• Addition of traffic signals at the Pennsylvania Avenue/I-10 EB on-ramp and Pennsylvania Avenue/I-10 WB off-ramp intersections
• Retaining wall along the NB side of the I-10 EB on-ramp
• Relocation of the existing sewer line that is located along Pennsylvania Avenue to accommodate the lowering of the existing roadway. The sewer line would be rerouted west along East 6th Street to Massachusetts Avenue where it would then travel south. A jack and bore approach would be used to install the sewer line under I-10, and the line would tie-into the existing sewer line that exists just south of I-10 and north of the UPRR alignment.
A shoofly (approximately 4,000 feet in length) would be created just south of, and parallel to, the existing UPRR tracks for use during construction to minimize impacts to UPRR.
The portion of the work within Caltrans’ right of way includes installing traffic signals, sewer relocation, retaining walls, new Americans with Disabilities Act (ADA) curb ramps, sidewalks, and modification to the EB I-10 on-ramp and WB I-10 off-ramp at Pennsylvania Avenue.
Contact Information
Name
Gita Tokhmafshan
Agency Name
Caltrans District 8
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
Beaumont
Counties
Riverside
Regions
Citywide
Cross Streets
Pennsylvania Avenue and Interstate 10
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
CCR Section 15282(g) (PRC 21080.13)
Reasons for Exemption
The purpose of this project is to grade separate Pennsylvania Avenue from the UPRR line, thereby eliminating an existing grade crossing. This is consistent with Section 21080.13 of the Public Resources Code (and Section 15282(g) of the CEQA Guidelines).
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.