Holy Cross New Church and Hall Use Permit Amendment
2 Documents in Project
Summary
SCH Number
2025110889
Lead Agency
Sacramento County
Document Title
Holy Cross New Church and Hall Use Permit Amendment
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2026
Document Description
The project consists of a Use Permit Amendment (93-UPB-0753) and Design
Review to increase the seating capacity from 150 to 253 persons and to modify the previously approved phasing plan at an existing church in the Interim Agricultural Reserve/Surface Mining (IR/SM) zoning district. Construction associated with the proposed project consists of a new 18,000 square-foot, two-story church . The church structure will consist of a 9,100 square-foot social hall on the first floor and an 8,900 square-foot worship space on the second floor, which will be completed in two separate phases. In addition, a new 575 square-foot property maintenance
storage structure and a 900 square-foot play structure are proposed. The project also includes demolition of three structures on the subject property. Those three structures include a 1,340 square foot caretaker residence, a 485 square foot food closet (two-car detached garage) and a 950 square-foot single family residence that is currently
being used for refreshments and education. The existing 2,200 square-foot chapel and 3,900 square-foot shade structure will remain on the project site.
Contact Information
Name
Julie Newton
Agency Name
Sacramento County
Job Title
Environmental Coordinator
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Countywide, Unincorporated
Parcel #
063-0012-025-0000
State Highways
SR 16
Other Location Info
The project site is located at 9000, 9010 & 9155 Jackson Road (State Route 16), on the south side of Jackson Road, approximately 1,000 feet east of South Watt Avenue and 1,200 feet west of Hedge Avenue, in the Vineyard community of unincorporated Sacramento County.
Notice of Determination
Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
